640 likes | 779 Views
Radalgram Oktober 2009. Total PB = 2.947 (8,02%). Natuna = 319 Lingga = 477 Tjpinang = 655 Karimun = 482 Batam = 853 Bintan = 161. Total PB = 36.473 (99,28%). Batam = 23.825 Tjpinang = 3.784 Karimun = 3.456 Lingga = 2.079 Natuna = 1.673 Bintan = 1.603
E N D
Natuna = 319 Lingga = 477 Tjpinang = 655 Karimun = 482 Batam = 853 Bintan = 161
Batam = 23.825 Tjpinang = 3.784 Karimun = 3.456 Lingga = 2.079 Natuna = 1.673 Bintan = 1.603 Anambas = 53
Total PA = 177.746 (62,83%) PUS 282.898