The KM3NeT Project

ESFRI Meeting, Brussels, 09.03.2007. The KM3NeT Project. Uli Katz Univ. Erlangen. Objectives Current membership and funding Preparatory Phase The EMSO connection Structural funds. KM3NeT Objectives. Observe high-energy cosmic neutrinos

amalie
Download Presentation

The KM3NeT Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ESFRI Meeting, Brussels, 09.03.2007 The KM3NeT Project Uli Katz Univ. Erlangen Objectives Current membership and funding Preparatory Phase The EMSO connection Structural funds

  2. KM3NeT Objectives • Observe high-energy cosmic neutrinos • Opens new window to the most violent processes in the universe • Key objective of astroparticle physics • Convergence towards two major neutrino telescopes covering the full sky: ANTARES NEMO NESTOR Mediterranean Sea: KM3NeT ? Baikal experiment Lake Baikal: Antarctica: IceCube AMANDA • Provide infrastructure for long-term deep-sea measurements • Highly interesting for marine biologists, geologists and geophysicists, environmental scientists, oceanographers, …. • Strong links to the EMSO project. U. Katz: The KM3NeT Project

  3. How Neutrino Telescopes Work n KM3NeT n • Earth: screening against other particles Neutrino telescopes look downward (at high n energies: also upward sensitivity!) • Neutrinos interact weakly ~1 km3 (1 billion tons) target material • Light signals are weak need environment shielded against daylight IceCube n Galactic Centre 3 U. Katz: The KM3NeT Project U. Katz: The KM3NeT Project ESFRI Meeting, Brussels, 9.3.07 3

  4. The KM3NeT Design Study • 3-year FP6 Design Study, Feb. 2006 – Jan. 2009, 9 M€ from EU, overall budget ~20 M€ • Participants:30Particle/Astroparticle institutes +7 Sea science/technology institutes • Main Deliverables • Conceptual Design Report (fall 2007) • Technical Design Report (early 2009) } from 9 EU countries: U. Katz: The KM3NeT Project

  5. Current National/Regional Funding • Pilot projects: • ANTARES (cap. investment only) 20.1 M€ • FR, GER, IT, NL, ES funding agencies 14.5 M€ • France: Regional sources 1.9 M€ • FEDER/France 3.7 M€ • NEMO (IT,cap. investment only)17.0 M€ • IT funding agencies 10.9 M€ • FEDER/Italy 6.1 M€ • NESTOR (GR, cap. investment only) 8.0 M€ • Greek government 6.5 M€ • FEDER/Peloponnese 1.5 M€ _______45.1 M€ • KM3NeT (cap. + pers.) ca. 11.0 M€ • CY, FR, GER, GR, IRL, IT, NL, ES, UK funding agencies and other sources U. Katz: The KM3NeT Project

  6. The KM3NeT Preparatory Phase Proposal • Application in preparation(time very tight due to overlap with 1st-year Design Study report) • Major objectives to be addressed: • Path to convergence on funding decisions (KM3NeT cost estimate: roughly 250 M€) • Legal and governance aspects • Site decision (including assessment of multi-site options) • Production preparation • Data dissemination, data formats, computing • Coordination with marine sciences • Major goal: • Go ahead with construction in 2010/11! U. Katz: The KM3NeT Project

  7. The EMSO Connection • Large overlap in participating institutes • IFREMER, INGV, HCMR, Oceanlab/Aberdeen, … • Marine sciences represented in all KM3NeT management and steering bodies • Regular informal exchanges • Funding agencies are aware • INFN requests cross-coordination of KM3NeT and EMSOPP proposals • … • KM3NeT site(s) likely to become part of EMSO U. Katz: The KM3NeT Project

  8. Structural Funds • ERDF funds may be a major source of KM3NeT construction money • ERDF and FP7 run concurrently (2007-2013) • KM3NeT candidate sites are target-1/target-2 regions • Political coordination needed • Cross-coordination between ESFRI, EU DG Research (FP7), EU DG Regio (ERDF) and national authorities to promote research infrastructures • Avoid conflicting boundary conditions in both programs • Support for the concept of spending regional funds locally, but in the framework of pan-European projects • The situation must be clarified very soon! U. Katz: The KM3NeT Project