LBT Q4 2007 Engineering Review
PSPI: PEPSI installation preparation, includes all of the pier modifications. LBT Q4 2007 Engineering Review. Highlights (Q4/2007). PEPSI bridge location utilities installed, except power PEPSI bridge location, have installed clean dry air, 47 deg chill water, and fiber optic
133 views • 5 slides