1 / 7

LBT Q2 2007 Engineering Review

LBT Q2 2007 Engineering Review. TER Tertiary Mirror Units. Summary. Polish mirrors Coat mirrors Attach loadspreaders Integrate M3 assemblies Coordinate s/w dev Acceptance test units Install on telescope. Highlights (Q3/2007). SX unit installed on telescope 

heinz
Download Presentation

LBT Q2 2007 Engineering Review

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LBT Q2 2007 Engineering Review TER Tertiary Mirror Units

  2. Summary • Polish mirrors • Coat mirrors • Attach loadspreaders • Integrate M3 assemblies • Coordinate s/w dev • Acceptance test units • Install on telescope LBT Q3 2007 Engineering Review

  3. Highlights (Q3/2007) • SX unit installed on telescope  • Both mirrors integrated with supports  • Cabling completed and reterminated  • Basic software test completed  LBT Q3 2007 Engineering Review

  4. Open Issues • Technical • Software not certified safe • Mirror installation • Schedule/Financial • Pending software and need • Resource • Support needed for mirror install LBT Q3 2007 Engineering Review

  5. Progress (Q3/2007) • Loadspreader mounting (complete) • Software development (at milestone?) • Cannot be completed until both units installed • No further work/testing planned in 2007 • Integration (SX nearly complete) • Installation (SX unit installed) LBT Q3 2007 Engineering Review

  6. Progress (Q3/2007) cont. • SX wiring (complete) • Remove mirror cells (complete) • Mount mechanisms to telescope (SX done) • Loadspreader mounting (complete) • Mirror installation (Pending decision) • Commissioning (Pending) LBT Q3 2007 Engineering Review

  7. Planning (Q4/2007) • Pre-glass safety review • Install SX mirror (depends on need) • Commissioning? • Perform acceptance tests (requires s/w)? • Operations to complete power to UMACS LBT Q3 2007 Engineering Review