LBT Q1 2007 Engineering Review

LBT Q1 2007 Engineering Review. ENGG Engineering General. Highlights (Q1/2007). Assumed coordination of AO development in Italy Mechanical Engineering hire: Jim Wiese Optical Engineer hire: Andrew Rakich Acceptance testing Hexapod #3. Open Issues. Technical Az Encoder

thad
Download Presentation

LBT Q1 2007 Engineering Review

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LBT Q1 2007 Engineering Review ENGG Engineering General

  2. Highlights (Q1/2007) • Assumed coordination of AO development in Italy • Mechanical Engineering hire: Jim Wiese • Optical Engineer hire: Andrew Rakich • Acceptance testing Hexapod #3 LBT Q1 2007 Engineering Review

  3. Open Issues • Technical • Az Encoder • Mirror covers – Temporary and Facility • Telescope alignment plan • Vibration mitigation effort • Schedule • Extremely tight schedule for Gregorian preparation work • Slow progress on telescope commissioning • Financial • Tight but reasonable budget – tight cost control essential • Alignment tools unbudgeted • Mirror cell documentation cost unbudgeted • Hardpoint re-build unbudgeted • DYB/ROT budget uncertainty • Resources • High pressure and work load on group • Office and lab space • Mountain support and resources • Tech support in Tucson LBT Q1 2007 Engineering Review

  4. Progress (Q1/2007) • LBT Board Meeting Jan • MOU for Rigid Secondary Jan • Progress meeting LINC and Lucifer Jan • Progress meeting PEPSI Jan • Mirror Cell walkthrough Feb • Progress meeting MODS Feb • IR Test Camera kick-off meeting Feb • Progress meeting ADS and Microgate Feb • Hexapod #3 Acceptance test Feb • AO progress meeting Arcetri Mar • LBC progress meeting Mar • Major reviews: AO monthly, Rotator CDR, LBT Q1 2007 Engineering Review

  5. Planning (Q2/2007) • Andrew Rakich visit • LGS meeting May • LINC/Lucifer meeting May • LBT Board meeting May • Mirror cover test May • AGw #3 acceptance test May • LBC Red cryostat acceptance testing May/June • New student hire: Matthew Stohr • Vibration measurement campaign end of June • AO progress meetings / follow-up • Test Camera progress follow-up • Vacation LBT Q1 2007 Engineering Review