50 likes | 153 Views
LBT Q4 2007 Engineering Review. HPOP Hardpoints Study and Rework. Highlights (Q4/2007). Nothing to report at this time. Open Issues. Technical Consistency in testing Glass safety qualified Backlash in 50:1 gearbox for stepper motor Schedule None Financial Unbudgeted Resource People
E N D
LBT Q4 2007 Engineering Review HPOP Hardpoints Study and Rework
Highlights (Q4/2007) • Nothing to report at this time LBT Q4 2007 Engineering Review
Open Issues • Technical • Consistency in testing • Glass safety qualified • Backlash in 50:1 gearbox for stepper motor • Schedule • None • Financial • Unbudgeted • Resource • People • Time very limited LBT Q4 2007 Engineering Review
Progress (Q4/2007) • Testing has not occurred due to prioritization of other projects LBT Q4 2007 Engineering Review
Planning (Q1/2008) • Fabricate another ‘Differential’ Piston set with the appropriate gland widths • Continue stiffness testing, get better stiffness values from measurements • Test with eddy current sensors, instead of LVDT’s • Locate stiffness loss(es), and attempt to increase stiffness • Modify engine stand for gravitational loading/orientation stiffness testing LBT Q4 2007 Engineering Review