An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LBT Q4 2007 Engineering Review ALPC – Primary Mirror Aluminum Shooting

  2. Highlights (Q4/2007) • None LBT Q4 2007 Engineering Review

  3. Open Issues • Technical • Documentation for Aluminization System from OSU improved but needs more work • Upgrade of Aluminization System • Cleaning/Stripping System • Glow discharge ? • Locking devices unreliable • Crane needs to move ~1 meter farther forward to safely clear adaptive secondaries • M3 swing arms need to be retracted farther than normal to clear belljar • LBT personnel can do most of the process now, as long as nothing goes wrong • Something always goes wrong • Schedule • Aluminize SX August 08 (not 17 Aug) • Financial • None • Resources • How much effort do you put into medium priority tasks? LBT Q4 2007 Engineering Review

  4. Progress (Q4/2007) • Planning From Q3 Review • Nothing planned for Q4 √ LBT Q4 2007 Engineering Review

  5. Planning (Q1/2008) • Nothing planned for Q1 LBT Q4 2007 Engineering Review