This document provides an overview of proposed modifications to the South Mezzanine in the MICE Hall. It includes information on clashes between existing structures and devices, as well as suggested resolutions to these clashes. The document also discusses outstanding questions and possible clashes that still need to be addressed.

aprilg
Download Presentation

MICE Hall – South Mezzanine

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MICE Hall – South Mezzanine Jason Tarrant - STFC • Contents • Device checks with current South Mezzanine • South Mezzanine change summary • Conclusion

  2. MICE Hall – South Mezzanine • Device checks with current South Mezzanine • AFC • Spectrometer Solenoids • RFCC • EMR / KL • Hydrogen System Current South Mezzanine

  3. MICE Hall – South Mezzanine • AFC • Hydrogen Safety Vacuum Line port currently will clash with floor Current South Mezzanine Current floor height

  4. MICE Hall – South Mezzanine • AFC • Hydrogen Safety Vacuum Line itself currently clashes with rails & support leg Clash with rails Clash with support leg AFCs not shown so vacuum pipe run can be seen

  5. MICE Hall – South Mezzanine • AFC • Raise platform, move support leg & cut beams back to resolve Beams cut back Raised & shortened floor section (hinged) Support leg moved to next beam ‘joggle’ required in handrail around vacuum pipe

  6. MICE Hall – South Mezzanine • Spectrometer Solenoid • ToF Cage & instrument port close to South Mezzanine Instrument port ToF assembly arm

  7. MICE Hall – South Mezzanine • Spectrometer Solenoid • Rotate / mirror ToF arm & raise platform Beams cut back if required Proposed raised floor Instrument port (X-section from back) ToF assembly arm

  8. MICE Hall – South Mezzanine • RFCC Ports protrude into walkway 1m walkway (preferred) Major clash between current South mezzanine and RFCC Services tray clash

  9. MICE Hall – South Mezzanine • RFCC Width of walkway (floor level narrow!) Gas panel Ports to be moved to opposite side Mezzanine shortened & raised at front 2x 300mm services tray to replace 1x 450mm (current water pipes to be moved too)

  10. MICE Hall – South Mezzanine Water pipe & panel move • RFCC Mezzanine raised up over RFCC

  11. MICE Hall – South Mezzanine • EMR EMR does not clash in final location (apart from support legs) but when it is craned in (it has no rolling platform)

  12. MICE Hall – South Mezzanine • Mezzanine & EMR Potential clash with support pillars at other steps Step VI Step V June 2011 Step IV

  13. MICE Hall – South Mezzanine • Mezzanine & EMR June 2011 Step IV Step V Step VI Hinged floor section lifted to install Support legs moved (red legs = old position)

  14. MICE Hall – South Mezzanine • Mezzanine & Hydrogen system Only issue noted is that the H2 system services & frame to be raised in line with raised floor to give appropriate headroom on gangway

  15. MICE Hall – South Mezzanine • South Mezzanine change summary • Move 4 of 5 support legs to another beam, 1 extra added to minimise platform span • Fit cross beam between support legs to support intermediate beams the cut back intermediates • Fit hinged platform sections spanning between support leg beams • Higher & shorter than current mezzanine (avoids RFCC & AFC pipe line) • Rail with ‘dog leg’ fitted to outer beam

  16. MICE Hall – South Mezzanine Hinge platform (raised) View along cooling channel (from upstream) with proposed South Mezzanine modifications • South Mezzanine change summary RFCC Platform shims & boosters AFC Spec Sol Water pipe re-routed for cable trays Proposed cable trays

  17. MICE Hall – South Mezzanine Current South Mezzanine • South Mezzanine change summary

  18. MICE Hall – South Mezzanine • South Mezzanine change summary Protruding hydrogen system Hinged sections Intermediate beams cut back Existing mezzanine Moved supports (red = old positions) Extra beam

  19. MICE Hall – South Mezzanine • South Mezzanine change summary Platform shims & boosters Cross beam with hinges for platform Existing mezzanine Intermediate beams cut back

  20. MICE Hall – South Mezzanine • South Mezzanine Design – Status • Concept design complete • Detail design nearly finished • Manufacturing drawings to be started

  21. MICE Hall – South Mezzanine • Outstanding questions • Is the narrow walkway acceptable for safety? • OK’d by RAL safety, but suggested leave as late as possible to allow H2 system to be installed in relative comfort, i.e. Widest gangway • Structurally OK? • Spoke with structural engineering consultant = OK’d in principle but awaiting final design / manufacturing drawings

  22. MICE Hall – South Mezzanine • Outstanding questions • Can the H system frame & pipes be raised to give headroom? • Is the raised floor compatible with the hydrogen racks? • Who is responsible for ToF modification & can this be done? • Can / is shutter mechanism on Spectrometer solenoids to be modified?

  23. MICE Hall – South Mezzanine • Possible clashes & resolutions • Spectrometer Solenoid shutter mechanism • Shutter mechanism being redesigned? • Could mechanism be modified? Potential clashes Step VI Step V Step IV To move post again would make platform span too big Red post is old position = big clash with AFC

  24. MICE Hall – South Mezzanine • Possible clashes & resolutions • AFC Valve • Final placement will determine extent of cut to beam & platform shims / boosters Valve on middle AFC Platform shims & boosters

  25. MICE Hall – South Mezzanine • Conclusion • Step IV changes • Waterpipe move • Cable tray changes • Upright support leg posts moved for AFC & 1 extra added • 1 cut beam to be replaced • Platform raised near Spectrometer solenoid instrument port unless instrumentation can be mounted to avoid Mezz (awaiting instrumentation info from A Bross) • Hinged platforms to be fitted over current EMR and Step IV EMR positions* • Step V changes • All other platform changes! * Not installing all platforms would create an even floor unless simple temporary booster sections used to match floor level!