An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Coupling Coil Status S. Gourlay August 1, 2012

  2. Coupling Coil Test Prep • Cooling tube welding • Pressure test • Horizontal and vertical milling operations • Lead, Quench Protection mounts • Coil vacuum epoxy impregnation • Gap between cover plate and coil • Seal gap (no leaks!) • Design/fab holding fixture for potting • Manufacture QP and lead support parts • Install temp sensors, strain gauges

  3. Coupling Coil Status/Activities • Pressure test complete • Documentation in progress • QP hardware installed • Thermal test with fixture complete • Should start potting today • Out by tomorrow • Install strain gauges (six) in strategic areas • Assemble lead stabilizers • Shipping crate will arrive this week