Special Report NuMI Target Updates

Kris Anderson 04-Apr-2011. Special Report NuMI Target Updates. Status Update Target Hall • Target hall work for week starting 4/4 will be focused on NT-06 beamline installation, survey, target beam scans, and readiness for full NuMI beam operation

aren
Download Presentation

Special Report NuMI Target Updates

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Kris Anderson 04-Apr-2011 Special Report NuMI Target Updates Status Update Target Hall • Target hall work for week starting 4/4 will be focused on NT-06 beamline installation, survey, target beam scans, and readiness for full NuMI beam operation NT-06 Preparation for Beamline Installation • Completed installation of NT-06 in carrier frame assembly • Completed target survey in several target z-locations at MI-8 • All features fall within specified tolerance (~ ¼ mm) III. Reclaim NT-02 as a contingency spare • ALARA plan generated to remedy slipping couplers and install a new DS screw drive bearing block • Plan has been submitted to AD/Radiation Safety • Work to recover z-drive motion expected to start Tuesday 4/5

  2. Special Report NuMI Target Updates NT-06 Retrofit NT-06 Target/Baffle Carrier Assembly Survey work in LE10 position

  3. Special Report NuMI Target Updates NT-06 Retrofit NT-06 Target/Baffle Carrier Assembly

  4. Special Report NuMI Target Updates NT-06 Retrofit NT-06 Target/Baffle Carrier Assembly View of baffle from US end (beams-eye view)

  5. Special Report NuMI Target Updates NT-06 Retrofit NT-06 Target/Baffle Carrier Assembly Target assembly moved into NuMI Target Hall

  6. Special Report NuMI Target Updates NT-06 Retrofit NT-06 Target/Baffle Carrier Assembly Moving target carrier to workcell for installation on module

  7. Key Dates Special Report NuMI Target Updates Estimated Key Dates-Nominal Scenario NT-06 Installation • Installation of NT-06 into beamline chase 4/4 – 4/9 • Estimate for beam ~12:00 on Sunday 4/10 II. NT-02 Path (Contingency Target) • NT-02 is leak tight but status of z-drive reclamation is still TBD • Efforts will start Tuesday 4/5 at CO to remedy slipping drive couplers and install a new bearing block assembly on the drive screw at the downstream location