1 / 18

Maggotty Hydro Expansion Project, Jamaica

Maggotty Hydro Expansion Project, Jamaica. Project Overview & International Working Fraser Allison MEng CEng MICE. Contents. Project Overview The Existing Plant The Expansion Project International Working. The Drive for Hydro in Jamaica. 96% of Energy from Fossil Fuels in Jamaica

Download Presentation

Maggotty Hydro Expansion Project, Jamaica

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Maggotty Hydro Expansion Project, Jamaica Project Overview & International Working Fraser Allison MEng CEng MICE

  2. Contents Project Overview The Existing Plant The Expansion Project International Working

  3. The Drive for Hydro in Jamaica 96% of Energy from Fossil Fuels in Jamaica Sustainability Issues Hydro ~ 2% (22MW) of total (1.1GW) Electricity Prices are high & variable Development Finance Available

  4. Project Overview - Maggotty Owner – Jamaica Public Service Co. (JPS) EPC Contract – Value $27M EPC Contractor – Kier Construction Ltd. MML – Designer and Technical Advisor Andritz Consortium – M&E Plant

  5. Mott MacDonald Scope Hydraulic Modelling Hydrological Assessment Basic & Detailed Civil Design M&E Engineering Building Services Transient Review Scope of Supply – Hydroplant Balance of Plant Control & Protection Interfaces – new and existing schemes

  6. Project Details – Key Facts Gross Head = 96m Doubling Capacity to 12.6MW 2 new Francis Units – 3.15MW each 2.4km Pipeline Total Design Flow = 17.2 cumecs Re-use of Existing Elements

  7. Project Summary

  8. The Existing Scheme – Built in 1959 Designed by Scottish Engineers Mechanical plant built in Scotland

  9. The Proposed Scheme - New Intake

  10. New Pipeline DN2600/DN2400/DN2100/DN1800 GRP Mainly Above Ground – Some Buried

  11. New Powerhouse Turbine Hall Floor Plan

  12. Project Players Gross Head = 96m MWH (USA) – Owner’s Engineer MML (UK) - Designer Andritz (Fr) – Turbine design & supply JPS Co. (Jm) - Client Indar (Esp) – Generator design & supply Andritz (Mx) – C&I Design & supply Kier (Jm / UK) – EPC Contractor O-TEK (Co) – GRP Pipe Supplier

  13. Opportunities – International Working World Bank ($6Bn) & others financing New markets – hydro and others related Make a real difference – build capacity Appetite for development Technology & skills exportable

  14. Key Risks / Challenges – International Working Communication Cultures & Skills Standards & Safety Quality Bespoke design Control of Local Issues

  15. www.mottmac.com

More Related