130 likes | 213 Views
Hydro Project Planning Overview. Request for Tides / Water Level Support. Requirements Planning. 1. Determination of tidal characteristics of the survey area , potential differential effects of meteorology or river flow on water levels in the survey area
E N D
Requirements Planning • 1. Determination of tidal characteristics of the survey area, potential differential • effects of meteorology or river flow on water levels in the survey area • 2. Determination of appropriate operating control station(s) from the National • Water Level Observation Network (NWLON) for computation of tidal • datums and water level reducers • 3. Determination of subordinate station locations required for operation • during the survey for computation of water level reducers and tidal datums • Generate Preliminary Tidal Zoning referenced to an operating NWLON station • 5. Write Project instructions to support hydrography or photogrammetric surveys
Wind Wind Influence Great example for not running hydro of predicted tides!
Rain Influence • Rain / River Runoff can distort tidal signatures • Run hydrography during anomalous period- significant error in tide reducers.
Diurnal / Semidiurnal Transitional Areas Gulf of Mexico 5.6 miles Atlantic Ocean
Key Colony Vaca Key CHANGE IN TIDE TYPE High range Semi-diurnal tide Low range Noisy diurnal tide
NWLON Stations and Active Stations http://www.tidesandcurrents.noaa.gov/gmap3/