Data Communications Program DCL Trials DCIT Update MEM ATCT To: DCIT Plenary From: Matt Maki Date: 12.06.2012
Agenda • DTAP Development Status: • DTAP Development/Milestone Deliveries • Trials Schedule Update • On-Going / Completed Trials Activities Status: • DTAP Certification • MEM Training & Procedures • Trials Metrics Development • Trials CSP Service Update • EWR Trials – Schedule/Planning Discussion
DTAP Milestone Deliveries • SE2020 Deliverables / DTAP Development: • Limited Trials Build undergoing Functional Testing @ WJHTC • Fixes previous HIGH/MED-HIGH level PTRs • Installed @ MEM ATCT 12/3 for continued Functional /FDX-UPS Testing • CAF, UM80, UM79 (Non INT), AOC DM (non SI Doc compliant) • Full Trials Build scheduled estimated for delivery to the WJHTC on Jan 22 • Initial UM79 requirement included (ERAM FIR Boundary limits) • UM83 and discovered ‘out of scope’ minimum Trials requirements included • Additional requirements from testing included • Represents ‘full fleet’ Trials functionality
MEM Limited Ops Trials (~ 3 Ops/Day - 2 Weeks) • Nov 27: • Limited Ops Build installed on WJHTC Data Comm lab DTAP • Limited Ops Build installed on designated Training DTAP3 • Dec 3-14 (WJHTC & MEM Functional/Pre-SAT Testing) • Limited Ops Build installed on MEM ATCT DTAP • Limited Ops Build Functional Testing @ MEM ATCT (Bench and FDX/UPS aircraft avionics planned) • Limited Ops Build WJHTC Functional Test summary review • Dec 17-20 Boeing / Airbus Bench Testing Window • Dec 24-Jan 1 (Holiday Break) • Jan 2-7: - OT2 @ MEM (Jan 2) • Limited MEM ATC Training (DTAP3 Training machine) • Formal MEM SAT (Jan 3-4) • Trials Start Checkpoint – Go/No Go (Jan 7) • Jan 7-21: Buffer • Jan 22 – TRIALS START (Jan 14 Target Start Option)
MEM Limited Ops Trials Timeline Functional Testing @ WJHTC & MEM 11/27 – 12/14 Additional Functional Testing BUFFER 12/14 – 12/24 Holiday Break 12/24 – 1/2 OT2, ATC Training, SAT @ MEM 1/2 – 1/7 BUFFER 1/7 – 1/21 Limited Ops Trials Window (TBD Ops/Day – 2 Weeks) 1/22 – 2/10 FEB DEC NOV JAN
MEM Full Functionality Trials Ops • Dec 10-17: • Final DTAP SE2020 Contract Build 6 Requirements/Delivery Date Implementation • Jan 22-Feb 6: • Full Functionality Build installed on WJHTC DTAP – Functional Testing Window • FDX Pilot Training 30 Day Notice Given (FF Build Accepted for Trial Ops – 2/4) • Jan 29-Feb 8: -Conduct OT3 @ MEM (1/29) - Conduct Formal ATC DTAP Training @ MEM • Feb 10-Feb 15: - END OF LIMITED OPS TRIALS (2/10) • Install Full Functionality Build on MEM DTAP (2/11) • Pre-SAT, Functional Testing Activities • FDX GOC Training 2 Week Notice Given • Feb 18-22: • Formal Full Functionality Build SAT @ MEM • Full Trials Go/No-Go Checkpoint (2/22) • March 4: FULL FUNCTIONALITY TRIALS START ~50 flights (2/25 Target Start Option) - Trials Procedures Shake Out
MEM Full Functionality 24x7 Ops Trials • April 4 MEM Full Fleet Trials • Starts 120 Day Trials Review Checkpoint Timer
MEM Full Ops Trials Timeline FDX Pilot Training 30 Day Notice – 2/4 FDX GOC Training 14 Day Notice – 2/15 Functional Testing @ WJHTC 1/22 – 2/6 End of Limited Ops Trials, MEM DTAP Upgrade 2/10 – 2/15 SAT @ MEM, Trials FF GO Checkpoint 2/18 – 2/22 Buffer Full Functionality Trials Start, Procedures Shake Out (~50 DCL Flights) 3/4 – 4/4 Full Functionality 24x7 Trials Ops 4/4 + 120 Days OT3 & ATC Training @ MEM 1/29 – 2/8 APR FEB MAR JAN
Tech Ops DTAP Certification • Certification on Track to enable Trials start: • Tech Ops reps completed draft DTAP Certification procedures at the WJHTC lab on 10/10 & 11 • Procedures / FAM Training complete • AJW-13 to propagate Notice to field / trials sites • FSEP office notified FTI that Cert / FAM procedures are satisfactory: • Allows FSEP DTAP log entry & FTI check-off • Train MEM Tech Ops Scheduled for December 17: • Trained MEM Tech Ops reps credentialed via District Mgr.
MEM Training and Procedures • MEM Training and SAT Procedures complete: • Limited MEM DTAP Training scheduled for Jan 2-7 2013 • Full MEM DTAP Training planned for Jan 29 – Feb 8 • MEM Trials SAT draft released for internal review 12/3 • FDX Training: • FDX AOC/Dispatch training (2 weeks advance notice req) • FDX Pilot training (30 day advance notice req) • FAA CMO LOA (2 weeks advance notice req)
Trials Metrics Development • DTAP log file analysis underway: • Thales to provide tools for decoding/presenting DTAP log file data • Summary Trials data analysis planned • DCIT Plenary Update • Independent Safety Assessment Office (AJI-321) planning Trials evaluation and analysis: - Trials team to provide ISA with Trials procedures, metrics and test plans
Trials CSP Service Update • ARINC/SITA Current Agreements: • ARINC Trials service being extended from current 12/31 POP end • Additional ARINC extensions available if required • SITA service contract extended on month x month basis
EWR Trials Schedule/Planning • Verify limited Trials start @ EWR can commence before the MEM 120 day review checkpoint • EWR Trials Start in April is a challenge for DCP: • EWR ATC accepts final MEM DTAP functionality for initial Trials implementation (Dec, DCIT Ops Mgt) • EWR CHI functionality updated utilizing a TBD DTAP release • EWR May-Sept Implementation Freeze Out • EWR Trials Implementation Activities Underway: • Meeting at facility with ATC and Tech Ops Mgt (12/17) • FTI Telco/Network Connectivity Order Initiated • DTAP ZNY HADDS/OARS interface configuration Initiated • HADDS, FDIO Test NCP development Initiated • Equipment Implementation goal in March • Initial operators include UAL, FDX, UPS, LFT
Questions ? KMEM