1 / 7

Data Communications Program

Data Communications Program. MEM/EWR ATCT DCL Trials PMR Update. To: Jesse Wijntjes , Program Mgr From: Gregg Anderson, Matt Maki, Pete Muraca Date: 03.11.2013. Agenda. MEM Trials Build 4.5 Limited Ops Summary MEM Schedule Milestones Build 6.0 Functional Testing Status

Download Presentation

Data Communications Program

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Data Communications Program MEM/EWR ATCT DCL Trials PMR Update To: Jesse Wijntjes, Program Mgr From: Gregg Anderson, Matt Maki, Pete Muraca Date: 03.11.2013

  2. Agenda • MEM Trials Build 4.5 Limited Ops Summary • MEM Schedule Milestones • Build 6.0 Functional Testing Status • EWR Trials Schedule/Activities • Trials Timeline • Trials Budget

  3. Build 4.5 Limited Ops Trials Complete

  4. MEM Schedule Milestones • The Milestone Schedule Outlook: • Build 6 WJHTC Installation Complete: March 4 • Build 6 WJHTC/MEM Functional/Pre-SAT Testing: March 4-20 • MEM Limited Full Functionality Trials (3 Ops/day): March 26 – April 26 • MEM Full FANS Fleet 24x7 Trials Start: April 30 • 4pm Daily Build 6 Testing/PTR review telcon • Limited Full Functionality Trials on track for March 26: • Goal is 50 flight DCL operation shakeout • Minimum 35, 20 MD-11, 15 B777 • DTAP Build 7 Formal Requirement Development Underway - Thales starting scope/cost development for FAA review

  5. EWR Trials Schedule/Activities • EWR DTAP4 Hardware scheduled for pickup at Thales on March 15: • Will be driven to EWR ATCT • EWR DTAP4 equipment, cables and display installation at EWR ATCT confirmed for the week of March 18 • Team met with UPS on March 6 in Louisville: • UPS confirmed EWR Trials participation • UPS to provide live aircraft for ramp FANS/DCL testing during Pre-SAT and SAT testing at both MEM and EWR • Initial MOU comments back from UPS

  6. Questions ? KUSA