Data Communications Program. MEM/EWR ATCT DCL Trials DCIT25 Update. To: DCIT25 Plenary From: Matt Maki Date: 07.18.2013. Agenda. MEM / EWR Operational Trials Status MEM / EWR Trials Results Patch 5 / Build 7 Status MEM FDIO Test NCP Extension Status. MEM Trials Status Update.

maegan
Download Presentation

Data Communications Program

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Data Communications Program MEM/EWR ATCT DCL Trials DCIT25 Update To: DCIT25 Plenary From: Matt Maki Date: 07.18.2013

  2. Agenda • MEM / EWR Operational Trials Status • MEM / EWR Trials Results • Patch 5 / Build 7 Status • MEM FDIO Test NCP Extension Status

  3. MEM Trials Status Update • Full 24x7 Operations proposed for August 13 start: • B777 full functionality • MD11 only CAF until DTAP modification in place (send double TO points on UM79) • All MD11 flights affected – Domestic and International • MEM ATC will process only MD11 CAF UL • Non Route Revision UL to MD11 will be sent (DEP FREQ, EDCT, Etc.) • Pending final approvals/procedure training (CMO, MEM ATC, FDX) • EWR UPS AND FDX MD11 DCL OPS STILL FULL FUNCTIONALITY (Limited Trials Mode)

  4. EWR Trials Status Update • Airbus researching FMS issue affecting current SAS A333 operations: • UL/DL latency issues with older FMS configurations • SAS currently standing down until analysis complete • Active participants utilizing the service: • UPS (MD11) • BAW (B777) • DLH (A343, A346) • SAS (A333) • FDX (MD11, B777) – Starting July 20 • UAL (B767) – Starting July 21 • Draft MOUs sent to BAW, SAS, DLH: - Execution planned by end of SWAP season (Fall)

  5. MEM DCL Ops Since 4/17/13 - Start of Limited Ops Trials Current Up Thru 7/17/13

  6. MEM DCL Ops Since 4/17/13 - Lessons Learned Current Up Thru 7/17/13

  7. EWR DCL Ops Since 5/16/13 - Start of Limited Ops Trials Current Up Thru 7/17/13

  8. EWR DCL Ops Since 5/16/13 - Lessons Learned Current Up Thru 7/17/13

  9. DTAP Patch 5 and Build 7 Status • DTAP Patch 5 Requirements Updated: • Addition of requirement to send double TO point in UM79 uplinks (MD11 issue) • EWR ATC Requirements (Dual Contact / Drop Down Remarks, NONE ALT and SID) • Subject to SE2020 approval • Estimated Fall delivery • Build 7 Scope, Schedule Cost Proposal from Harris by 7/25: • FAA options to select specific functionality based on schedule/cost consideration • Build Contract Acceptance and Delivery to FAA currently TBD

  10. MEM FDIO Test NCP Extension Approved to NAS CCB • NCP number assignment Notification at 07/16/2013 09:14 AM CDTID: Case File JW925-FDIO-1003NCP/CCD: P34982Title: MEM ATCT Data Communications Trials Automation Platform (DTAP) Connection to a FDIO/PCRCU Echo Port (Extension of JW925-FDIO-1001/T34501)Message: NCP number: 34982 has been assigned to Case File: JW925-FDIO-1003 and submitted to NAS CCB for processing.

  11. Questions ? KUSA