Agenda • MEM / EWR Operational Trials Status • MEM / EWR Trials Results • Patch 5 / Build 7 Status • MEM FDIO Test NCP Extension Status
MEM Trials Status Update • Full 24x7 Operations proposed for August 13 start: • B777 full functionality • MD11 only CAF until DTAP modification in place (send double TO points on UM79) • All MD11 flights affected – Domestic and International • MEM ATC will process only MD11 CAF UL • Non Route Revision UL to MD11 will be sent (DEP FREQ, EDCT, Etc.) • Pending final approvals/procedure training (CMO, MEM ATC, FDX) • EWR UPS AND FDX MD11 DCL OPS STILL FULL FUNCTIONALITY (Limited Trials Mode)
EWR Trials Status Update • Airbus researching FMS issue affecting current SAS A333 operations: • UL/DL latency issues with older FMS configurations • SAS currently standing down until analysis complete • Active participants utilizing the service: • UPS (MD11) • BAW (B777) • DLH (A343, A346) • SAS (A333) • FDX (MD11, B777) – Starting July 20 • UAL (B767) – Starting July 21 • Draft MOUs sent to BAW, SAS, DLH: - Execution planned by end of SWAP season (Fall)
MEM DCL Ops Since 4/17/13 - Start of Limited Ops Trials Current Up Thru 7/17/13
MEM DCL Ops Since 4/17/13 - Lessons Learned Current Up Thru 7/17/13
EWR DCL Ops Since 5/16/13 - Start of Limited Ops Trials Current Up Thru 7/17/13
EWR DCL Ops Since 5/16/13 - Lessons Learned Current Up Thru 7/17/13
DTAP Patch 5 and Build 7 Status • DTAP Patch 5 Requirements Updated: • Addition of requirement to send double TO point in UM79 uplinks (MD11 issue) • EWR ATC Requirements (Dual Contact / Drop Down Remarks, NONE ALT and SID) • Subject to SE2020 approval • Estimated Fall delivery • Build 7 Scope, Schedule Cost Proposal from Harris by 7/25: • FAA options to select specific functionality based on schedule/cost consideration • Build Contract Acceptance and Delivery to FAA currently TBD
MEM FDIO Test NCP Extension Approved to NAS CCB • NCP number assignment Notification at 07/16/2013 09:14 AM CDTID: Case File JW925-FDIO-1003NCP/CCD: P34982Title: MEM ATCT Data Communications Trials Automation Platform (DTAP) Connection to a FDIO/PCRCU Echo Port (Extension of JW925-FDIO-1001/T34501)Message: NCP number: 34982 has been assigned to Case File: JW925-FDIO-1003 and submitted to NAS CCB for processing.