An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. European Transparency Regulation (ETR / ERGEG) – Industry briefing (06-Nov-2014 session) – tcon Author: NG ETR team Last Updated: 03-Nov-2014 (V0.1)

  2. Some ground rules • Login to the “live meeting” session as “name (company)”. For example: • Melanie (NG) • Do not use the “live meeting” audio. Please dial in separately using the conference details in the appointment. • When you have a query, use the dialog box to raise your hand. The presenter will stop at the appropriate moment and ask the person to speak. • When speaking, please announce yourself “name (company)”. Sorry for this. Due to the expected large number of attendees, it is essential to follow this. ETR Industry briefing v0.1 (03-Nov-14)

  3. Agenda Testing update Update on key MP queries Looking ahead Any other business ETR Industry briefing v0.1 (03-Nov-14)

  4. Testing update – MODIS testing internally All system generated reports tested and number of defects raised. ETR Industry briefing v0.1 (03-Nov-14) 4

  5. Testing update – Network Connectivity testing Quorum, RWE, Centrica test request received – network connectivity to NG system successful. DRAX has successfully deposited (using sFTP) a sample report into NG. For other MPs please contact Isaac Wilks for network testing and for FTP credentials. ETR Industry briefing v0.1 (03-Nov-14) 5

  6. Testing update (Processing of MP sample reports) • ENTSO-E Test platform access through: http://62.209.222.11 • Can view Master config data currently loaded – note that Production unit level capacity is displayed • Can view test reports that have been successfully processed Note: Need to navigate to United Kingdom Area (left hand side bar) and sub-category relating to National Grid ETR Industry briefing v0.1 (03-Nov-14) 6

  7. Testing update (Processing of MP sample reports) ETR Industry briefing v0.1 (03-Nov-14) 7

  8. Testing update (Processing of MP sample reports) – info gathered so far A15.1: • Mixed of success and failures at ENTSO-E end • Failures due to: • Incorrect EIC code for the Gen unit defined at ENTSO-E • Start and end date & time of the main report does not fully encompass the time-series (A01) points covered • Successes: • Mixed time-series resolution in a single report is acceptable • Use of P1D works ETR Industry briefing v0.1 (03-Nov-14) 8

  9. Update on key MP queries so far • Stats gathered since inception (20-Oct-14) as at 06-Nov-14: • 32 queries raised, 18 closed (was 11 and 5). • Key queries and responses: ETR Industry briefing v0.1 (03-Nov-14)

  10. Looking ahead NG has a dedicated tester importing MP sample reports and delivering of the Acks and Nacks NG is working closely with Elexon on system-to-system interface to allow faster turnaround on MP sample report feedback ETR Industry briefing v0.1 (03-Nov-14)

  11. Looking ahead • Continuing: Process MP sample reports onto ENTSOe platform via Elexon and provide feedback to MPs. • TBC: Release of MODIS to allow external user access. • w/c 01/12/14 (was 18/11): MODIS system rollout to Production. Note that Elexon system will not be available in the first 2 weeks of December 2014 to prepare for system go-live on 16/12/14. • 16/12/14 to 04/01/15: Day 1 data load period to be organised in batches. • Key risk(s) and issue(s): • Risk: Unable to provide external users access to MODIS due to technical difficulties in integrating NG security layer with the MODIS application • Mitigation: Alternative method being investigated. Initial testing expected Friday (31/10). • Risk: Unable to provide feedback on MP sample reports • Mitigation: Use of manual flow (via email) to NG Teat team. This is now possible since 17/10 when the pre-reg Master config file was successfully loaded in EMFIP (data used is aligned with LIO spreadsheet with a few exceptions). • Risk: MODIS not ready in time for go-live • Mitigation: Contingency plan being drawn up. Contingency solution requires MPs to submit reports via sFTP route. ETR Industry briefing v0.1 (03-Nov-14)

  12. Updates on key actions: ETR Industry briefing v0.1 (03-Nov-14)