European Transparency Regulation (ETR / ERGEG) – Industry briefing (06-Nov-2014 session) – tcon. Author: NG ETR team Last Updated: 03-Nov-2014 (V0.1). Some ground rules. Login to the “live meeting” session as “name (company)”. For example: Melanie (NG)
E N D
European Transparency Regulation (ETR / ERGEG) – Industry briefing (06-Nov-2014 session) – tcon Author: NG ETR team Last Updated: 03-Nov-2014 (V0.1)
Some ground rules • Login to the “live meeting” session as “name (company)”. For example: • Melanie (NG) • Do not use the “live meeting” audio. Please dial in separately using the conference details in the appointment. • When you have a query, use the dialog box to raise your hand. The presenter will stop at the appropriate moment and ask the person to speak. • When speaking, please announce yourself “name (company)”. Sorry for this. Due to the expected large number of attendees, it is essential to follow this. ETR Industry briefing v0.1 (03-Nov-14)
Agenda Testing update Update on key MP queries Looking ahead Any other business ETR Industry briefing v0.1 (03-Nov-14)
Testing update – MODIS testing internally All system generated reports tested and number of defects raised. ETR Industry briefing v0.1 (03-Nov-14) 4
Testing update – Network Connectivity testing Quorum, RWE, Centrica test request received – network connectivity to NG system successful. DRAX has successfully deposited (using sFTP) a sample report into NG. For other MPs please contact Isaac Wilks for network testing and for FTP credentials. ETR Industry briefing v0.1 (03-Nov-14) 5
Testing update (Processing of MP sample reports) • ENTSO-E Test platform access through: http://62.209.222.11 • Can view Master config data currently loaded – note that Production unit level capacity is displayed • Can view test reports that have been successfully processed Note: Need to navigate to United Kingdom Area (left hand side bar) and sub-category relating to National Grid ETR Industry briefing v0.1 (03-Nov-14) 6
Testing update (Processing of MP sample reports) ETR Industry briefing v0.1 (03-Nov-14) 7
Testing update (Processing of MP sample reports) – info gathered so far A15.1: • Mixed of success and failures at ENTSO-E end • Failures due to: • Incorrect EIC code for the Gen unit defined at ENTSO-E • Start and end date & time of the main report does not fully encompass the time-series (A01) points covered • Successes: • Mixed time-series resolution in a single report is acceptable • Use of P1D works ETR Industry briefing v0.1 (03-Nov-14) 8
Update on key MP queries so far • Stats gathered since inception (20-Oct-14) as at 06-Nov-14: • 32 queries raised, 18 closed (was 11 and 5). • Key queries and responses: ETR Industry briefing v0.1 (03-Nov-14)
Looking ahead NG has a dedicated tester importing MP sample reports and delivering of the Acks and Nacks NG is working closely with Elexon on system-to-system interface to allow faster turnaround on MP sample report feedback ETR Industry briefing v0.1 (03-Nov-14)
Looking ahead • Continuing: Process MP sample reports onto ENTSOe platform via Elexon and provide feedback to MPs. • TBC: Release of MODIS to allow external user access. • w/c 01/12/14 (was 18/11): MODIS system rollout to Production. Note that Elexon system will not be available in the first 2 weeks of December 2014 to prepare for system go-live on 16/12/14. • 16/12/14 to 04/01/15: Day 1 data load period to be organised in batches. • Key risk(s) and issue(s): • Risk: Unable to provide external users access to MODIS due to technical difficulties in integrating NG security layer with the MODIS application • Mitigation: Alternative method being investigated. Initial testing expected Friday (31/10). • Risk: Unable to provide feedback on MP sample reports • Mitigation: Use of manual flow (via email) to NG Teat team. This is now possible since 17/10 when the pre-reg Master config file was successfully loaded in EMFIP (data used is aligned with LIO spreadsheet with a few exceptions). • Risk: MODIS not ready in time for go-live • Mitigation: Contingency plan being drawn up. Contingency solution requires MPs to submit reports via sFTP route. ETR Industry briefing v0.1 (03-Nov-14)
Updates on key actions: ETR Industry briefing v0.1 (03-Nov-14)
End Last slide