1 / 7

Projeto D-Buster (Planejamento da segunda entrega) 2007

Projeto D-Buster (Planejamento da segunda entrega) 2007. G enerating A mazing E xp eriences. Integrantes. Allan Jefferson (Gerente) Armando Gonçalves Diogo Salazar Ícaro Ribeiro Igor Duarte João Gabriel Leonardo Vilaça Luciano Demétrio Márcio Dias Matheus Garcez

birch
Download Presentation

Projeto D-Buster (Planejamento da segunda entrega) 2007

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Projeto D-Buster (Planejamento da segunda entrega)2007 Generating Amazing Experiences

  2. Integrantes • Allan Jefferson (Gerente) • Armando Gonçalves • Diogo Salazar • Ícaro Ribeiro • Igor Duarte • João Gabriel • Leonardo Vilaça • Luciano Demétrio • Márcio Dias • Matheus Garcez • Thiago Alexandre • Thiago Ferreira • Thiago Gomes • Tiago Lemos

  3. Roteiro de apresentação Situação atual Escopo Segundo Release Alocação nas atividades Cronograma

  4. Situação Atual Desenvolvimento em fase inicial Dez estórias levantadas e validadas Reuniões frequentes com o cliente Outras estórias sendo levantadas Nova versão do protótipo validada Domínio das tecnologias necessárias

  5. Escopo [1/2] Visualição do mapa com exibição da situação Funcionalidades restritas de acordo com o login e senha Buscar localidade no mapa a partir de palavra-chave

  6. Escopo [2/2]

  7. Dúvidas

More Related