EMMA Shutdown Work Planning Meeting 11 th November 2011

EMMA Shutdown Work Planning Meeting 11 th November 2011. AGENDA. Aims Resources Discuss work program Develop work program. Aims.

bobby
Download Presentation

EMMA Shutdown Work Planning Meeting 11 th November 2011

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. EMMA Shutdown Work Planning Meeting 11th November 2011

  2. AGENDA Aims Resources Discuss work program Develop work program

  3. Aims • Install and commission the remaining EMMA work during this shutdown or as much as possible bearing in mind that we have resource and potentially time constraints • Time is fixed • Shutdown dates • Started Monday 1st November • Finish Friday 14th January 2011 • ALICE is being scheduled for operation from 17th Jan – 3 April 2011 • Resources are fixed • OTL booking code • TD EMMA STFD00001 Task 06.05 Only to be used for EMMA work • TD general unfunded code is STFD00001 Task 06.01

  4. Resources

  5. Work Diagnostic beamline Installation and commissioning Extraction power supplies 3 x Wall current monitor installation in the ring, injection line and the diagnostic beamline Survey the quadrupole magnets and BPMs Repair the RF cavity tuner drive coupling fixings Misc. electrical work Misc. controls work ……. ….

  6. DIAGNOSTICS BEAMLINEPHASE 1 Ion Pump H&V Corrector Vacuum Valve Vertical Corrector RGA Vertical Corrector BPM YAG Quadrupole x 4 Dipole YAG BPM Faraday Cup PHASE 1 now abandoned Agreement with ASTeC to go straight for Phase 2 installation

  7. DIAGNOSTIC BEAMLINE Phase 2Drawing 207-10324-M Sheet 4

  8. DIAGNOSTICS BEAMLINEPHASE 2

  9. EMMA Layout WCM WCM New Steps WCM Septum & Kickers racks