EMMA Shutdown Work Planning Meeting 11 th November 2011. AGENDA. Aims Resources Discuss work program Develop work program. Aims.
E N D
EMMA Shutdown Work Planning Meeting 11th November 2011
AGENDA Aims Resources Discuss work program Develop work program
Aims • Install and commission the remaining EMMA work during this shutdown or as much as possible bearing in mind that we have resource and potentially time constraints • Time is fixed • Shutdown dates • Started Monday 1st November • Finish Friday 14th January 2011 • ALICE is being scheduled for operation from 17th Jan – 3 April 2011 • Resources are fixed • OTL booking code • TD EMMA STFD00001 Task 06.05 Only to be used for EMMA work • TD general unfunded code is STFD00001 Task 06.01
Work Diagnostic beamline Installation and commissioning Extraction power supplies 3 x Wall current monitor installation in the ring, injection line and the diagnostic beamline Survey the quadrupole magnets and BPMs Repair the RF cavity tuner drive coupling fixings Misc. electrical work Misc. controls work ……. ….
DIAGNOSTICS BEAMLINEPHASE 1 Ion Pump H&V Corrector Vacuum Valve Vertical Corrector RGA Vertical Corrector BPM YAG Quadrupole x 4 Dipole YAG BPM Faraday Cup PHASE 1 now abandoned Agreement with ASTeC to go straight for Phase 2 installation
EMMA Layout WCM WCM New Steps WCM Septum & Kickers racks