An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SSR1 Cryomodule Schedule for PXIEFirst Draft Mark Champion October 18, 2011

  2. Assumptions (Champion, Ristori) • PXIE Overall Completion Milestone (Nagaitsev, Oct. 04, 2011) • Oct 2016: Beam through b=0.1 , 0.2 CM at ~15 MeV with nearly final parameters (1 mA cw, 5  mA peak, arbitrary bunch chopping) • VTS and STF throughput limited to ~2 tests / month each for SSR1 cavities. • QC inspection time will require ~2 weeks / cavity. • Visual inspection, dimensional checks, vacuum leak testing, and RF measurements • The first two cavities will receive bulk chemistry at ANL; the remainder may be processed at AES. • Light chemistry, high-pressure rinsing, and assembly to be performed at ANL. • Hydrogen degassing and low-temperature bake to be performed at FNAL. • Jacketing operations on the first cavity will start not sooner than March 2012. • Jacketing of second cavity to start only after successful testing of first jacketed cavity. • Tuners (whatever design) will be available in May 2012 for installation. • Will need to process & test 9 cavities in order to have 8 good cavities for CM.

  3. Comments / Conclusions • This schedule is only a first draft; many details are missing • For example, nothing has been included for solenoids • The critical path will include processing and testing of the cavities. • There appears to be ample time for the cryomodule design and parts procurement. • Initial Projection: CM completion Feb. 28, 2014 • More details to be added in the coming weeks.