CO2 cooling and IBL interface meeting Tooling cooling line at PP1

CO2 cooling and IBL interface meeting Tooling cooling line at PP1. Didier Laporte CNRS – LPNHE Paris 06 février 2014 EDMS IN2P3 : I-036854 – V2. Assembling tooling. First cooling line. Montage splitter box, Début montage des lignes, soudure. 6/8 lines on tools. Fitting stoppers.

candra
Download Presentation

CO2 cooling and IBL interface meeting Tooling cooling line at PP1

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CO2 cooling and IBL interface meetingToolingcooling line at PP1 Didier Laporte CNRS – LPNHE Paris06 février 2014 EDMS IN2P3 : I-036854 – V2

  2. Assemblingtooling

  3. First cooling line • Montage splitter box, • Début montage des lignes, soudure

  4. 6/8 lines on tools

  5. Fittingstoppers

  6. Ready to install

  7. In the pit, on scaffolding • LPSC table

  8. Mainframe Elcom 20x20

  9. Z table (axis) • Elcom

  10. Final position

  11. Sameoperation for the 6 lines

  12. Final position

  13. To do list : • Update of the lines (6 / 8 ), LAPP • Design side A, LPNHE • Splitter box interface, LAPP • Escargot interface, LAPP • Protection for travel, LPNHE • Connection links at PP1 (for tests), LPNHE • Command to do (Elcom), LAPP/LPNHE • Delivery date ?