BLIP Operations 2-28-12 . Status – running at 117.1 MeV @92µA Smooth operation at beam current reduced to 92 µA weekdays and 60µA on weekends . Weekly operations for 165.5 hours. Issues

casey
Download Presentation

BLIP Operations 2-28-12

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BLIP Operations 2-28-12 Status – running at 117.1 MeV@92µA Smooth operation at beam current reduced to 92µA weekdays and 60µA on weekends. Weekly operations for 165.5 hours. Issues Investigation into cause of water window failure continues. Transfer of failed component to hot cells for close inspection is scheduled for Thursday. Fabrication of spare water window started with modified design. We will utilize inconel 625 machined window welded to ss304 cap instead of welding ss304 sheet to ss304 cap. Inconel offers better strength and corrosion resistance. Diameter of cap will be reduced to ease installation and removal. This will help avoid splashing of radioactive water during removal. We still await delivery of AlBeMet vacuum window from vendor. .

More Related