BLIP operations 3-2-10. Status – running at ~ 139MeV BLIP average beam up to 98.3µA, with a high of 103.3 µA on 2/26 . Operation with beam 161hrs. Operations issues

Download Presentation

BLIP operations 3-2-10

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BLIP operations 3-2-10 Status – running at ~139MeV BLIP average beam up to 98.3µA, with a high of 103.3µA on 2/26. Operation with beam 161hrs. Operations issues Ion source pulse timing problem has reduced effective pulse rate below the expected 6.67Hz. This will be corrected next maintenance day. No target problems this week Research irradiation at 139 MeVbegan 3/1.

More Related