1 / 2

BLIP operations 03-22-11

BLIP operations 03-22-11. Status – running at 117.5MeV

ula
Download Presentation

BLIP operations 03-22-11

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BLIP operations 03-22-11 Status – running at 117.5MeV BLIP weekly average beam reduced to 98.4µA purposely, actually ~92µA for 4 days while Ga target in beam, then ~104µA over the weekend without Ga target. Weekly operations decreased to 149.4 hours due to Linac mod 3 failure and BLIP repair of target drive. Isotope production of Sr-82, Ge-68 and irradiation LBNE targets downstream of the isotope targets continues at reduced current. Operations issues Target drive system failure on 3/15 The sprocket on drive #2 was slipping on the motor shaft due to loose set screw. Simple repair required access to the contaminated motor housing on top of the hot cell, so most down time was due to preparation of paperwork.

More Related