An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BLIP operations 03-15-11 Status – off BLIP weekly average beam reduced to 97.0µA purposely. Operations decreased to 158.4 hours due to Linac maintenance. A broader Gaussian profile was achieved and another trial with a Ga target began 3/8 at slightly reduced intensity. No failure so far. Isotope production of Sr-82 and irradiation LBNE targets downstream of the isotope targets continues. Research irradiation for Cu-67was completed 3/8. Operations issues Target drive system failure today Preliminary diagnosis is that the sprocket on drive #2 is slipping on the motor shaft. Repair requires access to the contaminated motor housing on top of the hot cell. A RWP is being prepared. Investigation of cause of Ga targets leaks continues. We are investigating an alternate target design involving vapor deposition of either rhenium or alumina as a protective layer on the Nb cladding interior. Test pieces are being fabricated.

More Related