2011-2016 Proposed Highway Improvement Program. Public Works and Transportation Committee April 27, 2011. 2011-2016 Five Year Highway Improvement Program. Management philosophy sets system priorities : Preservation Modernization Expansion. Priority One: Preservation.
E N D
2011-2016Proposed Highway Improvement Program Public Works and Transportation Committee April 27, 2011
2011-2016 Five Year Highway Improvement Program • Management philosophy sets system priorities: • Preservation • Modernization • Expansion
Priority One: Preservation • Developing a set of projects • ARGUS Pavement Management Software • Keeping tabs on the system • Asset Inventories • $1.6 billion to build
Developing the Project Set • ARGUS Pavement Management System…… • ……Today is an introduction to ARGUS
Pavement Management Goal Make cost effective decisions For given 5 year budget levels: • Where repairs are needed • What repair strategies to use • When the repairs should be done
Pavement ManagementSystem Components: • County highway database • Automated pavement testing • Repair strategies with costs • Pavement aging prediction • Optimization program
County Highway Database Contains information on… • Surface type • Surface width • Section area • Traffic volumes • Percentage of trucks
Automated Pavement Testing • About 848 lane miles in system • County is divided into quadrants • One quadrant is tested each year • Entire county is covered in four years
Automated Pavement Testing First: Laser Road Surface Tester (RST) measures… • Cracking • Rutting • Ride quality
Automated Pavement Testing Second:Dynaflect deflection tester measures… • Strength and condition of pavement • Strength and condition of subgrade
Repair Strategies and Costs Two Groups of Roadway Priorities: (starting with 2012-2016 program analysis) • Four lane roads - 53 miles • Two lane roads - 242 miles
Repair Strategies and Costs • Four resurfacing strategies • Three “3R” strategies • Three reconstruction strategies • Associated per-square-yard costs
ARGUS Summary Pavement Management System does… • Assess the present condition of the system • Estimate future road conditions • Identify and rank road projects • Maximize the condition of the system within the given budget
ARGUS Summary … Pavement Management System does not… • Replace professional judgment • Provide certain detailed project-specific information
LCDOT ARGUS results • Started in 1986 • System condition has improved from a rating of 68to 78(on 100 scale) • Area of backlog and failing pavement has been reduced from 55% to 15%
2011 – 2016Proposed Highway Improvement Program The following charts to appear in Section 2 Preservation Projects
Keeping Tabs on the System:Asset Inventories • Pavement and bike facilities, guardrail • Bridges and railroad crossings • Signals and signs • Drainage and stormwater facilities • More…
Priority One: Preservation • Developing a set of projects • ARGUS Pavement Management Software • Keeping tabs on the system • Asset Inventories • Next Program Presentation: • Priority Two – System Modernization • Priority Three – System Expansion