1 / 25

MODERNIZATION Projects EXPANSION pROJECTS 2014-2019 Proposed Highway Improvement program

MODERNIZATION Projects EXPANSION pROJECTS 2014-2019 Proposed Highway Improvement program. Paula J. Trigg, County Engineer Public Works and Transportation Committee May 7, 2014. Presentation Schedule: 2014-2019 5-year Highway Improvement Program.

tegan
Download Presentation

MODERNIZATION Projects EXPANSION pROJECTS 2014-2019 Proposed Highway Improvement program

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MODERNIZATION ProjectsEXPANSION pROJECTS2014-2019 Proposed Highway Improvement program Paula J. Trigg, County Engineer Public Works and Transportation Committee May 7, 2014

  2. Presentation Schedule:2014-2019 5-year Highway Improvement Program

  3. 2014-2019 Five Year Highway Improvement Program • Management philosophy sets system priorities: • 1 - Preservation • 2 - Modernization • 3 - Expansion • Last meeting highlighted Preservation • This presentation focuses on Modernization and Expansion

  4. Priority Two: Modernization • Project set developed through traffic analysis • Projects provide improvements to the system, for example: • Intersection improvements – turn lanes, signals • Safety improvements • ITS elements in Lake County PASSAGE • Addition of bicycle facilities or pedestrian accommodations

  5. Proposed Bike Facilities

  6. Average Daily Traffic

  7. Level of Service Data Helps traffic engineers evaluate how a given intersection is functioning. Better levels of service mean fewer delays at the intersection. Intersections should perform at a level of “C” or better to meet driver expectations.

  8. Traffic Volumes: Intersections

  9. Average Daily Traffic: Then & Now

  10. 2014 Crash Summary (2012 TCAS data)

  11. Historical Perspective: Crashes*

  12. Lake County Traffic Signals

  13. Fiber Optic Network

  14. Expanding Computer Aided Dispatch (CAD) Coverage

  15. PASSAGE: Asset Inventories

  16. Priority Three: Expansion • Projects in this category address highway capacity issues • Typical projects: • Adding lanes to existing system • Building new roads • Projects in this category are usually expensive and have longer timeframes for completion

  17. Average Road Lengths

  18. Average Daily Traffic

  19. Growth in Lane Miles: County-Owned Roads

  20. Annual Vehicle Miles on County-Owned Roads

  21. 2040 roadway Priorities • Peak period trips estimated to increase by 36% between 2010 and 2040 • 212 miles of roadway Improvements recommended • 7 interchange • 9 intersection • 65 corridor

  22. History: Daily Vehicle Miles

  23. Expansion Projects(from 2013 to 2018 program)

  24. Summary Priority Two: ModernizationReduce delays and increase safety by accommodating short-term traffic growth and the needs of non-motorists. Priority Three: ExpansionProvide highway capacity to meet long-term traffic growth needs and provide for economic development.

  25. Presentation Schedule:2014-2019 5-year Highway Improvement Program