2013-2018 Proposed Highway Improvement Program. Paula J. Trigg, County Engineer Public Works and Transportation Committee May 29, 2013. Public Works and Transportation Committee: Spring 2013 Schedule. Funding and Revenue. 4 DOT Capital Program Revenue Streams: County Bridge Fund (CB)

lane-potter
Download Presentation

2013-2018 Proposed Highway Improvement Program

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 2013-2018Proposed Highway Improvement Program Paula J. Trigg, County Engineer Public Works and Transportation Committee May 29, 2013

  2. Public Works and Transportation Committee:Spring 2013 Schedule

  3. Funding and Revenue • 4 DOT Capital Program Revenue Streams: • County Bridge Fund (CB) • Matching Tax (MT) • Motor Fuel Tax (MFT) • Sales Tax (ST) • All zero growth except ST • ST @ 3.0%

  4. Pursuing Additional Funds for Effective Programming • Illinois Commerce Commission (ICC) Railroad Grade Crossing Protection • Congestion Mitigation and Air Quality (CMAQ) • Chicago Metropolitan Agency for Planning (CMAP) • Surface Transportation Program (STC, STE, STU) • Illinois Transportation Enhancement Program (ITEP) • Job Access/Reverse Commute (JARC) • Highway Bridge Program (HBP) • more

  5. Outside Funding: Challenge Bond Program • Outside revenue provides approximately 21% of program funding • 2 main sources: ICC (Illinois Commerce Commission) and CMAQ (Congestion Mitigation and Air Quality)

  6. MAP-21: Moving Ahead for Progress in the 21st Century Act • Signed into law by President Obama 7/6/12 • Extended previous law (SAFETEA-LU) through September 30, 2012 • Went into full effect October 1, 2012 • Authorizes programs for two years, through September 30, 2014

  7. Fund Sources For The 5 Year Highway Improvement Program

  8. 2013-2018 • Still in development; waiting for bid results on large project • 2012-2017 program was $557 million • Balance needs for • System Preservation • System Modernization • System Expansion • Debt Service

  9. How Highway Improvement FundsAre Distributed

  10. Next Month • Project listings 2013-2018 • Detail of What’s New? via email before June 26 • On target for June 26th endorsement • Becomes our capital budget submittal for CFY 2014

  11. Public Works and Transportation Committee:Spring 2013 Schedule