Program Recap and endorsement request 2014-2019 proposed highway improvement program

Program Recap and endorsement request 2014-2019 proposed highway improvement program. Paula J. Trigg, County Engineer Public Works and Transportation Committee June 25, 2014. Presentation Schedule: 2014-2019 5-year Highway Improvement Program. Program Recap and Endorsement Request.

dee
Download Presentation

Program Recap and endorsement request 2014-2019 proposed highway improvement program

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Program Recap andendorsement request2014-2019 proposed highway improvement program Paula J. Trigg, County Engineer Public Works and Transportation Committee June 25, 2014

  2. Presentation Schedule:2014-2019 5-year Highway Improvement Program

  3. Program Recap and Endorsement Request

  4. 2040 | Non-motorized • 316 miles of new facilities • 111 miles LCDOT facilities • Primarily off-street shared use paths • Emphasis on access to transit and jobs

  5. 2040 | Transit • Tailored to fit a suburban milieu • Less dependence on fixed routes • Pace market study • Extend Metra service to Wadsworth

  6. 2040 | Roadway • 36% more peak period trips by 2040 • 65add lane projects • 33interchange / intersection projects • 13 route extensions • 212 miles of improvements

  7. Preservation Category Highlighted Argus Pavement Management System Preservation Projects

  8. Priority 1: Preservation Goal is keeping highway pavements, bridges, bikeways, signals and related items in good condition $120.7 million programmed [2014-2019]

  9. What’s new in this 5-year program? • PreservationProjects: • Pavements--Resurfacing or Reconstruction • $27 million • 39 miles • 24 locations • Upgrade PASSAGE equipment • Drainage Repairs—3 locations • Annual maintenance items—patching, crack sealing, trees, guardrail, etc. • Bike path paving • Bike path bridge – McClory path over Scranton Ave (w/Lake Bluff)

  10. Modernization and Expansion Categories

  11. Priority 2: Modernization Goal is reducing delays and increasing safety by accommodating short-term traffic growth and the needs of non-motorists $131 million programmed [2014-2019]

  12. What’s new in this 5-year program? • Modernization Projects: • Intersection Improvements—3 locations • Software systems maintenance or upgrades—TCAS (Crash Analysis) and CARS (Capacity Analysis) • Signal Equipment and Coordination • ITS PASSAGE signal coordination • ADA Ramps

  13. Priority 3: Expansion Goal is providing highway capacity to meet long-term traffic growth needs and provide for economic development $237 million programmed [2014-2019]

  14. What’s new in this 5-year program? • Expansion Projects: • Deerfield Road – Saunders Rd to IL 21 • Buffalo Grove Road portion of Cook Co project on Lake Cook Rd • Russell Road – right of way for future bike path

  15. Funding and Revenue • 4 DOT Capital Program Revenue Streams: • County Bridge Tax (CB) • Matching Tax (MT) • Motor Fuel Tax (MFT) • Sales Tax (ST) • Growth forecasts for revenue streams: • Flat for County Bridge Tax and Match Tax • Slight increase for Sales Tax • Slight decline for Motor Fuel Tax

  16. Highway Improvement Funds Distribution (CB, MT, MFT, ST) Program Total $697 million $547 million w/o federal construction funds

  17. Fund Sources For The 5 Year Highway Improvement Program

  18. Questions?