180 likes | 485 Views
Wire for 32 position lab (adding 12) Leave the existing color printer. ... Library already has network wiring/Internet access. Install 32 drops in the new lab. ...
E N D
Slide 1:Proposed Wiring Plan
Slide 2:Bell High School Single story – under one roofBell High School Single story – under one roof
Location of Wiring Closets - Wiring ClosetsSlide 3:5 wiring closets spaced out Main closet in 2E T1 line Router 5 wiring closets spaced out Main closet in 2E T1 line Router
Lab 1 One 20 position lab that is networked within the classroom using peer-to-peer with two shared printers for remediation to prepare students for LEAP and GEE. Wire for 32 position lab Disperse 2 shared printers to classrooms Buy a network printerSlide 4:20 position lab that is networked within the classroom using peer to peer with two shared printer for remediation to prepare students for the LEAP and GEE Wire for 32 position lab Disperse 2 shared printer to classrooms Buy a network printer 20 position lab that is networked within the classroom using peer to peer with two shared printer for remediation to prepare students for the LEAP and GEE Wire for 32 position lab Disperse 2 shared printer to classrooms Buy a network printer
Wire for 32 position lab Disperse 10 existing printers to classrooms Buy a network printer. Install NIC Cards in existing computers (20) One 20 position lab that is NOT networked but has one switched printer for each two computers (10 printers total) in the business department. Lab 2Slide 5:One 20 position lab that is NOT networked but has one switched printer for each two computer (10 printers total) in the business department. Wire for 32 position lab Disperse 10 existing printers to classrooms Buy a network printer Install NIC cards in existing computers (20) One 20 position lab that is NOT networked but has one switched printer for each two computer (10 printers total) in the business department. Wire for 32 position lab Disperse 10 existing printers to classrooms Buy a network printer Install NIC cards in existing computers (20)
Lab 3 The ornery art department (sorry Dede) has 10 Macs and they refuse to give them up. They are currently networked with Appletalk and one color printer. Wire for 32 position lab (adding 12) Leave the existing color printer.Slide 6:Art department – 10 Macs Currently networked with Appletalk One color printer Wire for 32 position lab Leave the existing color printer Art department – 10 Macs Currently networked with Appletalk One color printer Wire for 32 position lab Leave the existing color printer
New Lab Network Segment -Administrative Offices Administrative Segment Administrative Offices have been previously wired. Wire for 8 drops in Room 1S. Wire for 32 drops in Room 3S (LEAP Lab). Switches Needed = Total of 3 Network Segment - East A East A Segment Install 8 drops in each of the 13 classrooms. Install 32 drops in the business lab. Total drops will equal 136. Install 7 switches in the wiring closet. Network Segment - East B East B Segment Install 8 drops in each of the 9 classrooms. Library already has network wiring/Internet access. Install 32 drops in the new lab. Total drops will equal 112. Install 6 switches in the wiring closet. Network Segment – West B West B Segment Install 8 drops in each of the 4 classrooms Install 4 drops in Room 4G. Install 4 drops in Room 6G. Install 4 drops in Stage Area. Install 4 drops in Cafeteria. Install 4 drops in Kitchen. Total drops will equal 52. Install 3 switches in the wiring closet. Network Segment - West A West A Segment Install 12 additional drops in Room 4W – Appletalk Lab. Install 8 drops in Room 6W- Shop. Install 8 drops in Tech Class Room. Install 32 drops in Room 8W – Tech Lab. Total new drops will equal 60. (80 total drops) Install 3 switches in the wiring closet.Slide 18:The End