1 / 11

Rencana Kerja Kampanye Pride

Rencana Kerja Kampanye Pride. KKLD SELAT TIWORO. DATA & FAKTA. Tutupan Terumbu Karang Hidup Di Selat Tiworo Terus Menurun yakni 2.642/5 tahun (2002 – 2007) (Rahman, 2008) Pengukuran Terumbu Karang Keras Hidup Di ZP Selat Latoa tinggal 18 % (Data tahun 2005 : 34 %)

domani
Download Presentation

Rencana Kerja Kampanye Pride

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Rencana KerjaKampanye Pride KKLD SELAT TIWORO

  2. DATA & FAKTA Tutupan Terumbu Karang Hidup Di Selat Tiworo Terus Menurun yakni 2.642/5 tahun (2002 – 2007) (Rahman, 2008) Pengukuran Terumbu Karang Keras Hidup Di ZP Selat Latoa tinggal 18 % (Data tahun 2005 : 34 %) Telah terjadi Overfishing (106 % ikan demersal & 122 % udang) (Mulyadi, 2001) Nelayan Sudah tidak dapat menunjukkan kawasan terumbu karang yang masih baik Nelayan Masih Menangkap Ikan Dalam Zona Perlindungan (Rata2 : 4 kapal/hari) Data Survey Kualitatif & Kuantitatif : Nelayan di Tahapan Prekontemplasi dalam urutan perubahan perilaku

  3. Membayangkan Masa Depan Mereka !!!

  4. KAMPANYE PRIDE dengan ToC nya CR TR BC BR IC A K Interpersonal Communication Knowledge Behavior Change Attitude Barrier Removal Threat Reduction Conservation Result Tutupan Terumbu Karang Stabil (dari 18 % menjadi 18 %) Nelayan Masih menangkap ikan dalam zona perlindungan Nelayan menangkap ikan dengan menggunakan alat yang merusak Nelayan Masih menangkap ikan Di Luar zona perlindungan Nelayan menangkap ikan dengan menggunakan alat ramah lingkungan Belum adanya POKMASWAS Beluam adanya Kesepakatan Bersama Pengelolaan ZP Selat Latoa Belum adanya Tanda Batas Zona Perlindungan Selat Latoa Diskusi Tentang Tanda Batas Diskusi Tentang Manfaat ZP Diskusi Tentang POKMASWAS Diskusi Tentang Fungsi Tanda Batas Mendukung Kesepakatan Bersama Pengelolaan ZP Selat Latoa Mendukung Keberadaan POKMASWAS Menyetujui Keberadaan Tanda Batas Lokasi Zona Perlindungan Manfaat Zona Perlindungan Manfaat POKMASWAS Fungsi Tanda Batas

  5. KAMPANYE PRIDE : Menjual BR dengan SM • Barier Removal : pokmaswas, kesepakatan & tanda batas

  6. WAKTU PELAKSANAAN PRIDE JULI 2013 APRIL 2013 NOPEMBER 2013 MARET 2014 Lomba Masak Pelatihan Manajemen Ekonomi Usaha Perikanan Dangdutan Pride Lembar Dakwah Khotbah Jumat Pembuatan Bajo Kaos BR3 Lomba Domino Konservasi Pencetakan Kalender 2014 POSYANDU II Pertandingan Futsal Pembuatan Jadwal Imsak Lembar Cermah Ramadhan Ceramah Ramadhan Lomba Mengaji dan Saritilawah Lomba Masak Pelatihan Manajemen Ekonomi Usaha Perikanan Dangdutan Pride Lembar Dakwah Khotbah Jumat Spanduk Ramadhan (Hari Raya Idul Fitri) Lomba Bola Gotong Pembuatan Poster Manfaat Zona Perlindungan Posyandu 1 Pembuatan Bajo Kaos BR2 Pembuatan Sign Board KKLD Selat Tiworo Pembuatan Logo Pembuatan Slogan Pembuatan Maskot Lokakarya Pride Diskusi One on One Pertemuan Desa Pembuatan Lembar Fakta Pembuatan Poster POKMASWAS Tarik Tambang (Hari Samudera) Lomba Perahu (Festifal Perahu Hias) Lomba Dayung Anak Sekolah Dasar Pembuatan Gelas (Mug) Pembuatan Papan Nama Kios Pendidikan Lingkungan Anak Sekolah Dasar Pendidikan Lingkungan di SMP dan SMA Pembuatan Sarung Pantai Pembuatan Bajo Kaos BR1

  7. KITA BISA !!!!! Mengintegrasikan kegiatan lembaga dengan kegiatan Kampanye Pride Melakukannya dengan bersama – sama Terbuka dan demokratis

  8. DUKUNGAN PENDANAAN KAMPANYE PRIDE KKLD SELAT TIWORO Rp 148.000.000,- (SM) Rp 94.500.000,- (BR) Rp 242.500.000,- (Total) Rp 55.000.000,- (SM) Rp 129.735.000,- (BR) Rp 184.735.000,- (Total) Total : Rp 203.000.000,- (SM) Rp 224.235.000,- (BR) Rp 427.235.000,- (Grand Total)

  9. RENCANA AKSI

  10. Semua ada di tangan kita, dengan kemauan, kewenangan & kelebihan kita masing-masing Kita Mendapatkan Mitra Yang Tepat Mari melangkah lebih maju ....

  11. terimakasih

More Related