An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MICRONESIA AIP PROJECT STATUS UPDATE Gordon Wong, FAA Civil Engineer

  2. AIP Reauthorization On December 12, 2003, the President of the United States of America signed H.R. 2115 (FAA Vision 100 – Century of Aviation Reauthorization Act), Public Law No. 108-176, making Micronesian airports eligible for Airport Improvement Program (AIP) discretionary funds FY2004 TO FY2007.

  3. AIP PRIORITY RANKING SYSTEM • Safety (FAR Part 139 & ICAO Annex 14) • Reconstruction (Airfield Pavements) • Standards (Design Criteria) • Capacity (Parallel TXY, RWY, etc).

  4. FAA AIP PRIORITY PROJECTS • Safety - ARFF • Reconstruction - RUNWAYS

  5. ARFF VEHICLES • ARFF Vehicles & Equipment for all Micronesian airports to meet equivalent FAR Part 139 • AIP Grants issued FY2004 • CPA assisting in bulk procurement • Same vehicles throughout Micronesia • Specs Advertised April/May 2005

  6. NEW ARFF BUILDINGS • ARFF Buildings at all Micronesian airports to house new ARFF Vehicles • AIP Grants FY2005 • AE contracts awarded - Palau, FSM • Relocate SAWRS to ARFF Building

  7. RUNWAY REHABILITATION PROJECTS • Rehabilitate Runways at Palau, Pohnpei, Majuro (includes Marking, Lighting, Signage)

  8. PALAU INTERNATIONAL AIRPORT • ARFF Vehicles & Building (SAWRS) • Rehabilitate RWY 9/27, Apron, TXY • Loading Bridges • Airport Master Plan • Perimeter Fencing

  9. PALAU RUNWAY PROJECT • Quick Fix (seal coat) within few months • Est. Cost - $15 million (overlay) • Plans & Specs 90% Complete • Est. Bid Opening – July 2005 • Est. Construction – September 2005 • Est. Completion – April 2006

  10. FEDERATED STATES OF MICRONESIA • Chuuk • Kosrae • Pohnpei • Yap

  11. CHUUK INTERNATIONAL AIRPORT • ARFF Vehicles & Building (SAWRS) • Airfield Marking, Lighting, Signage • Airport System/Master Plan • Vacuum Sweeper • Perimeter Fencing

  12. KOSRAE INTERNATIONAL AIRPORT • ARFF Vehicles & Building (SAWRS) • Expand Terminal Apron Area • Airport System/Master Plan • Vacuum Sweeper • Resurface RWY 5/23 • Perimeter Fencing

  13. POHNPEI INTERNATIONAL AIRPORT • ARFF Vehicles & Building (SAWRS) • Rehabilitate RWY 9/27, Apron, TXY • Airport System/Master Plan • Vacuum Sweeper • Perimeter Fencing

  14. POHNPEI RUNWAY PROJECT • Quick Fix within few months • AE contract awarded February 2005 • Est. Bid Opening – February 2006

  15. YAP INTERNATIONAL AIRPORT • Typhoon Damage Repairs • ARFF Vehicles & Building (SAWRS) • Rehabilitate Apron/TXY • Airport System/Master Plan • Vacuum Sweeper • Perimeter Fencing

  16. YAP TYPHOON REPAIRS • AIP Grant FY2004 • AE contract awarded February 2005 • Terminal Building • Perimeter/Security Fencing • Airfield Marking, Lighting, Signage

  17. REPUBLIC OF THE MASHALL ISLANDSAMATA KABUA (MAJURO) INTERNATIONAL AIRPORT • ARFF Vehicles & Building (SAWRS) • Rehabilitate RWY 7/25 • Airport Master Plan • Relocate Perimeter Road • Vacuum Sweeper

  18. MAJURO RUNWAY PROJECT • Est. Cost - $20 million • Plans & Specs 90% Complete • Est. Bid Opening – June 2005 • Est. Construction – September 2005 • Est. Completion – April 2006

  19. The End