1 / 13

0-6549 Hydraulic Performance of Staggered-Barrel Culverts for Stream Crossings

26 Aug 2010: Progress Meeting. 0-6549 Hydraulic Performance of Staggered-Barrel Culverts for Stream Crossings. Agenda. Introductions By-Task Progress Problems Miscellaneous Lab Visit. Introductions. Researchers: Project Management Committee: Visitors:. Project Background.

donat
Download Presentation

0-6549 Hydraulic Performance of Staggered-Barrel Culverts for Stream Crossings

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 26 Aug 2010: Progress Meeting 0-6549 Hydraulic Performance of Staggered-Barrel Culverts for Stream Crossings

  2. Agenda • Introductions • By-Task Progress • Problems • Miscellaneous • Lab Visit

  3. Introductions • Researchers: • Project Management Committee: • Visitors:

  4. Project Background • Develop knowledge to address the issue of solids accommodation in Texas Department of Transportation low-water crossing structures (not bridges). • To develop design guidelines to assist in building multiple barrel systems that mimic the necessary stream behavior to facilitate solids migration.

  5. Progress by Tasks • Brief by-task report. • Task 1: Literature Review • Task 2: Screening Tools • Task 3: Quantitative Modeling • Task 4: Data Analysis • Task 5: Reporting

  6. Task 1: Literature Review • TM1 submitted. • Copies on server • Database(s) assembled. • QA/QC complete, still finding inconsistencies, but small fraction of the database.

  7. Task 2: Screening tool(s). • Database dependent • QA/QC on-going as just reported • Tools in-progress to allow database use.

  8. Task 3: Quantitative modeling. • Laboratory system functional. • Have solids in-place and will demonstrate today. • Have USGS provided satellite uplink to capture measurements. • Most instruments are ready • Camera lens choices and other methods still in-progress before begin production experiments.

  9. Task 4: Data Analysis. • 2-D/2-phase computer program (UH researchers) to guide experiments. • MIKE-3D CFD computer program (TTU) to extrapolate to larger scales. • CAP-R (Culvert Analysis Program – R) to provide design and performance guidance. http://waterdata.usgs.gov/tx/nwis/uv/?site_no=333509101470800&PARAmeter_cd=00065,00060,00062,72020,00054

  10. Task 5: Reporting. • SAR due end of August • Monthly reports on server; July 2010 should be there. • TM1 submitted

  11. Problems Encountered • Taking TTU longer to start experiments than anticipated. • Weir calibration • Nuisance issues. • Leaks, computers failing, etc.

  12. Miscellaneous • Anticipate some additional model building expenses first quarter FY11. • Would like to visit some systems in FY11.