250 likes | 631 Views
Table Top Exercise. Evacuation, Complete or Partial Facility. Tabletop Exercise Introduction. Introduction of players How the exercise will be played Questions and answers. Narrative.
E N D
Table Top Exercise Evacuation, Complete or Partial Facility
Tabletop Exercise Introduction • Introduction of players • How the exercise will be played • Questions and answers
Narrative • There is a construction project in process at your facility. Upon digging ruptured the operator ruptures the hospital water main, causing your facility’s basement to flood.
Scenario Event 1 • The power to the building has been interrupted.
Scenario Event 2 • Alarms are going off in the ICU.
Scenario Event 3 • Generators are in a flood section of the basement and have been rendered unusable.
Scenario Event 4 • Pharmacy services and the lab have been affected by the flooding.
Scenario Event 5 • The media arrive at the facility and are demanding information
Scenario Event 6 • Family members are calling stating their loved one isn’t answering their phone and demanding to know where they are.
Break 10 minutes Please return promptly
Scenario Event 7 • Several concerned family members are trying to enter through loading doc.
Scenario Event 8 • Several supply areas were damaged by the water, rendering equipment unusable.
Scenario Event 9 • The ruptured pipe has been repaired and should be a full capacity within an hour.
Hot wash • Player’s feedback • Evaluator feedback • Group discussion • Suggestions for improvement