Table Top Exercise

Table Top Exercise. Partial Building Collapse. Tabletop Exercise Introduction. Introduction of players How the exercise will be played Questions and answers. Narrative.

Download Presentation

Table Top Exercise

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Table Top Exercise Partial Building Collapse

  2. Tabletop Exercise Introduction • Introduction of players • How the exercise will be played • Questions and answers

  3. Narrative • There is a construction project in process at your facility. A large tractor backed into the corner of the old building and cracked the building support. The building shifted and internal walls are cracking. The building houses the main pharmacy and x-ray department on the first floor. The laundry and housekeeping department is in the basement and the MRI department is on the second floor.

  4. Scenario Event 1 • The pharmacy walls are cracked and debris is falling on the medications.

  5. Scenario Event 2 • The relocated staff, patients and visitors are gathering in the front lobby.

  6. Scenario Event 3 • There are patients scheduled for x-rays in the emergency department.

  7. Scenario Event 4 • The damaged storeroom in the basement is the main storage area for housekeeping supplies and equipment.

  8. Scenario Event 5 • The x-ray technicians are concerned over the radiological isotope in the x-ray department.

  9. Break 10 minutes Please return promptly

  10. Scenario Event 6 • Floors are running out of linen.

  11. Scenario Event 7 • The damage to the building will take two weeks to repair.

  12. Scenario Event 8 • The medications in the pharmacy are unusable.

  13. Scenario Event 7 • The housekeeping and laundry personnel are inquiring about continuation of services.

  14. Hot wash • Player’s feedback • Evaluator feedback • Group discussion • Suggestions for improvement