80 likes | 177 Views
Next Generation 911 Committee. Text-to-911. Next Generation 911 Committee. Technical Support RFP. What the Committee is doing. ESInet GIS Call Routing Hosted Services Network Operations Center and Help Desk CAD Interoperability Radio Interoperability. Approximate Project Time Lines.
E N D
Next Generation 911 Committee Technical Support RFP
What the Committee is doing • ESInet • GIS Call Routing • Hosted Services • Network Operations Center and Help Desk • CAD Interoperability • Radio Interoperability
Approximate Project Time Lines 2015 • Procure Technical Support to assist in writing an RFP • Create a Concept of Operations • Create a Cost Model based upon the Concenpt of Operations • Write an RFP • Post the RFP
Approximate Project Time Lines 2016 • Evaluate RFP Responses • Negotiate Six Agreements • Working with the Vendors Create a Project Plan • Design/outline/document/plan the Network and Process Deliverables
Approximate Project Time Lines 2017 • Begin buildout of network and infrastructure components • Test network and infrastructure components 2018 • Begin moving PSAPs onto the network and deploying services 2019 • Complete moving PSAPs onto the network and deploying services