1 / 2

APE meeting 10/18/11

APE meeting 10/18/11. Timesheets: Try to track accurately APE management (no-project meetings): 7751601 APE Standard Service (computers, software, lab supplies, safety training): 7751603 APE U/G: significant infrastructure upgrades (major lab instruments, new data acquisition systems) 7751609

elyse
Download Presentation

APE meeting 10/18/11

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. APE meeting 10/18/11 • Timesheets: Try to track accurately • APE management (no-project meetings): 7751601 • APE Standard Service (computers, software, lab supplies, safety training): 7751603 • APE U/G: significant infrastructure upgrades (major lab instruments, new data acquisition systems) 7751609 • APE UDT (Undistributed time): Only if you have nothing useful to do (none of us should be using this): 7751602 • Jim Turner’s Dump / FEE stuff – charge our labor to 7720214, other stuff to specific accounts • For PD shifts, use 7723301 global controls (I think – still under discussion). • Apes charge $150/hour. Keep in mind when comparing purchases and labor

  2. Other Items • Performance reviews • Will need to normalize reviews to some mean and standard deviation (exact values under discussion) • I will fill out the individual categories with absolute numbers, then adjust the final result mathematically to get the required averages. • APEs are substantially above average, so adjustments will be for lower numbers. • Tell me what can be done to improve things (some of you already have). • Lab Equipment: what to have here, what to have at PEP? • New hire to replace Nate – few applicants. • Project database: Use SharePoint (expanded?). Something else? Need some way to track who is doing what. • Safety Training: Thank you for keeping up to date.

More Related