June 2, 2009 Sprague – Asphalt

June 2, 2009 Sprague – Asphalt. Sprague Spill Overview. June 2, 2009 / 1830 est. a discharge of PG 64-28 Asphalt occurred at Sprague Energy Terminal in South Portland Discharge size: approximately 20 bbls. Spill occurred approximately 1 hour into transfer with the T/V ASPHALT SEMINOLE

ena
Download Presentation

June 2, 2009 Sprague – Asphalt

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. June 2, 2009 Sprague – Asphalt

  2. Sprague Spill Overview • June 2, 2009 / 1830 est. a discharge of PG 64-28 Asphalt occurred at Sprague Energy Terminalin South Portland • Discharge size: approximately 20 bbls. • Spill occurred approximately 1 hour into transfer with the T/V ASPHALT SEMINOLE • Total potential: 40,000 bbls. Est.

  3. A Picture

  4. Another Picture

  5. Notifications • USCG received initial notification from Sprague POC at 1905 EST. • By 1930 Sprague Energy Terminal had made all their appropriate notifications – to include the NRC • Clean Harbors was on-scene by 1900 to begin clean up operations – Sprague’s OSRO • USCG and ME DEP arrived on-scene by 2000 EST to begin their investigations

  6. Clean Up Operations

  7. Clean Up Operations

  8. Clean Up Operations

  9. Clean Up Operations • Clean up operations began on the 2nd of June and went throughout a portion of the night. • The asphalt stayed coagulated within the protective boom containment • Clean Harbors was able to use hack saws and knives to cut the large patches of asphalt and manually remove it from the water

  10. Manual Removal

  11. Manual Removal

  12. Manual Removal

  13. Manual Removal

  14. Manifold and Piping

  15. Manifold and Piping

  16. Source

  17. Clean Up Operations • Diver Down found no asphalt in the water column • The clean up was concluded on the 4th of June at approximately 0730 • Once Sprague repaired the ruptured piping they continued on with the transfer which was completed shortly after the clean up.

  18. Marching On