An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. LINAC 4 TL diagnostics F. Roncarolo, U. Raich L.Soby, J.Tan, C.Zamantzas, F. Lenardon, C.Vuitton, G-J.Focker L4 BCC – 1 Sep 2011

  2. General Remarks / Overview DESIGN • Completed for almost all instruments (most of TL devices == L4 monitors) • Basically all devices will be tested at 3 MeV test stand • Open issues • Number of devices and locations: need frozen layout • Once done: details about interconnections • Profile monitor in dump line (see later slide) • BLM detector type (see later slide) • Equipment of TL with station for laser stripping R&D SCHEDULE / BUDGET • Present advancement/plans/budget for design, fabrication, cabling and installation under control • BI Linac 4 review (with reviewers panel) on October 18th (tbc and announced in the next few days) L4 BCC - 01 Sep 2011

  3. Diagnostics Park • From Layout DB 31-08-11 • 3 BTVs now replaced by 1 WS or SEM GRID (H+V) L4 BCC - 01 Sep 2011

  4. Beam Current Transformers BCT • Copy of LEBT monitors • 100 mm diameter • Up to 200 MHz sampling rate • Acquisition sync. with the distributor, to know how much beam current goes to each PSB ring • Electronics ready for such option • NeedFPGA code update (likely not possible before LS1) • In general • Do we agree on the number of devices? • Foreseen by BI : 6, Layout DB: 7 L4 BCC - 01 Sep 2011

  5. Beam Position Monitors (BPM) • Shorted strip-line detectors • Same design for all L4 BPMs • Diameter for TL monitors: 100 mm, L = ~250mm • Electronics with down-mixing of 22 MHz  maximum sampling rate 4x22=88 MHz • 50 ns pulse length beam position measurement foreseen by the design (noise levels to be investigated) • For TL: is # of monitors and location frozen ? • At the moment of installing TL BPMs: will it be possible to change the 17 old TL monitors (after BHZ20)? J. Tan L4 BCC - 01 Sep 2011

  6. Profile Monitors (SEM Grids) • Same design as all L4 monitors – will require reduced pulse length (100us) • Mechanics ~ on schedule, 140 mm flange-to-flange (PIMs type) • New electronics under development, to be tested on 3 MeV test stand • 200 kHz ADC band (5 us) • Wire polarization • New connectors and cables: 32 channels in 1 cable • Is this up to date? Once frozen: verify details of flange connections L4 BCC - 01 Sep 2011

  7. Dump Line profile monitor • 3 screens option abandoned • Additional monitor not included in BI plans • What are requirements? • SEM Grid or WS ? • Spare L4 SEM grid • single shot meas • 24 wires fixed pitch • Spare L4 WS • multishotmeas • 40 um resolution (wire diam.) • SEM grid on stepping motor • Not foreseen by BI (can recuperate test bench device?) • Not single shot but can improve resolution with less shots than WS • new SEM with variable resolution (by variable rotation w.r.t. beam axis) • not foreseen  design new or try to recuperate L2 type device • When rotation != 90 deg: during single shot the sampling is done at different longitudinal locations L4 BCC - 01 Sep 2011

  8. Beam Loss Monitors (BLM) • Electronics under development, in parallel to L4 linac and PSB new electronics • Special screened cables to minimize EM noise (problem in other world-wide linacs) • TL cable installation on stand-by while waiting for latest beam optics and BLM location s • Every second BLM location is equipped with a spare cable to host an additional monitor if needed • Choice of detector (Ionization chamber, chamber type, or possibly other detectors) under discussion 2 us : sampling the integral -Integrated detector signal sampled every 2 us -From pA to mA detector output current Auto-gain switching Wide dynamic range expected ! Auto-gain switching W.Vigano, C. Zamantzas L4 BCC - 01 Sep 2011

  9. Laser Stripping R&D • Aim at profile + emittance measurement • For testing @ Linac 4 • At least 1 station • Y chamber @ dipole • Establish laser location and optical line path • If there will be no intermediate dump between 1st bend and BI line: • can test only laser stripping and profile meas (no emitt.meas) with a station after PIMS LASER stripping H0 monitor H0 monitor LASER stripping Possible locations H0 monitor L4 BCC - 01 Sep 2011

  10. SOFTWARE • BCT – BPM • Low level completed or well on the way to completion • Need OP GUI development • All will be tested at 3 MeV test stand • SEM grids • Low level and OP GUI done, being used at test stand • BLM • Definition of the memory map • CPU in readout simulation mode • Start development of driver, RT software, etc. • First version of memory map (LINAC4) - end of September L4 BCC - 01 Sep 2011

  11. SPARE L4 BCC - 01 Sep 2011

  12. L4 BCC - 01 Sep 2011

  13. L4 BCC - 01 Sep 2011