CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5

CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5. Darin Acosta University of Florida. CSC Track-Finder Crate. Single crate system, in production now. Clock & Control Board. Sector Processor. SR. SR. SR. SR. SR. SR. SR. SR. SR. SR. SR. SR. CCB. MS. /. /. /.

ernie
Download Presentation

CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CSC Track-Finder Plans for Commissioning at Bat.904 and Point 5 Darin Acosta University of Florida

  2. CSC Track-Finder Crate Single crate system, in production now Clock & Control Board Sector Processor SR SR SR SR SR SR SR SR SR SR SR SR CCB MS / / / / / / / / / / / / SP SP SP SP SP SP SP SP SP SP SP SP From MPC SBS 620 Controller (chamber 4) Muon Sorter From MPC (chamber 3) From MPC (chamber 2) From MPC (chamber 1B) From MPC (chamber 1A) To DAQ Interfaces: 180 optical links from 60 EMU peripheral crates (3 fibers/crate) 72 SCSI cables to/from DTTF crates Commissioning Meeting

  3. Status of Track-Finder • Second-generation Sector Processor prototype has been fully tested, along with a prototype CCB (TTC interface) and Muon Sorter • SP production launched with two pre-production samples • Board manufacture complete and inspected • Will be thoroughly tested once successfully assembled • Production & single board tests complete by May ’05 • Additional 2 months of testing in U.S. for full Track-Finder crate tests with Muon Sorter • Ready for tests at CERN with full production system by Aug. ’05 • But, the existing 3 prototypes are available for testing at CERN now • Prototype is nearly identical to final design Commissioning Meeting

  4. DT/CSC Integration Tests • Two tests have taken place in last 15 months • Tested data communication from each Track-Finder to the other through separate transition cards and cables • More sophisticated tests will need to take place in the future (Bat.904) to test our synchronization procedure, combined Track-Finding, and software integration Commissioning Meeting

  5. CSC TF Used as Trigger at Beam Tests ME3/2 ME2/2 ME1/2 ME1/1 RPC  Full chain of trigger electronics from detector to TF tested Commissioning Meeting

  6. Scale of Electronic Test at Beam Tests CCB MS PC0: ME2/2 SP2 SP1 Have tested up to 3 peripheral crates (~3 EMU disks) with up to 2 SP’s (260° sectors) PC1: ME1/1 + ME1/2 (But with only 4 chambers…) Commissioning Meeting

  7. ME3 (9 CSCs) ME2 (9 CSC’s) ME1 (18 CSC’s) Track-Finder at CMS Magnet Test • CSC system will participate in the CMS magnet test with a 60° slice of one endcap • 36 chambers from 3 stations • trigger and readout cosmic ray hits • CSC TF will provide a cosmic trigger (or can be triggered) • Experience at beam tests very useful • Plan smaller slice tests even before magnet test (March) Commissioning Meeting

  8. Answers to remaining questions • Resources required in 904: • Rack space, power, network access, lab bench space for repairs and PC, locked storage for one crate of cards • Interaction with other Sub-Systems, until the end of 2005 • EMU (peripheral crates) • DT TF • GMT and GT • DAQ • Contact person • Acosta for now, but replaced very soon by CERN-based postdoc • Summary: • Essentially ready for system tests at 904 and SX5 now Commissioning Meeting