Professeurs chargés du projet : M. Mazelier et M. Hérail Elèves participant au projet :

Professeurs chargés du projet : M. Mazelier et M. Hérail Elèves participant au projet : Élèves de 2 nde TP : Rigal G, Raynal J, Dubernard M, Raboteau M, Trio H Elèves de 1 ère TP : Mezy J, Valex K, Pignat R, Darthout R, Fayard N, Bertrand R

floyd
Download Presentation

Professeurs chargés du projet : M. Mazelier et M. Hérail Elèves participant au projet :

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Professeurs chargés du projet : M. Mazelier et M. Hérail • Elèves participant au projet : • Élèves de 2nde TP : Rigal G, Raynal J, Dubernard M, Raboteau M, Trio H • Elèves de 1ère TP : Mezy J, Valex K, Pignat R, Darthout R, Fayard N, Bertrand R • Elèves de Terminale TP : Guyonnet M, Papillon C, Golfier B, Le Bail G, Ribeyre G, Veze N

  2. Présentation du chantier : • Réalisation d’un mur de soutènement en U de 12 mètres de large par 8 mètres de long avec quatre poteaux pour un futur garage. • Vue en plan du mur :

  3. Différentes tâches de la réalisation du mur : -Terrassement de masse -Terrassement pour la semelle du mur -Ferraillage et bétonnage de la semelle

  4. Ferraillage & bétonnage

  5. -Coffrage du mur de soutènement - Assemblage et mise en place du ferraillage - Mise en place d’un drain et remblaiement

  6. Bétonnage du mur de soutènement