An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Experiment of 11.7GHz PE at AWA DL 2/27/2014

  2. Some Background information(i):

  3. Some Background information(ii): S21= -0.5dB@11.7GHz S11= -26dB@11.7GHz

  4. Some Background information(iii):

  5. Some Background information(iv):

  6. Where: AWA DRIVE BEAM---19MeV

  7. Structure

  8. When: Proposed starting date of experiment: 5/1

  9. Execution before the next meeting in around a week • 19MeV beam simulation---John/Dan • Structure assembling---Jing • Cleaning the rf load --- Sergey • Installation layout--- Scott (cross, pumping, ict location…) • Pump and leak check of diagnostic beamline--- Eric