90 likes | 256 Views
Experiment of 11.7GHz PE at AWA DL. 2/27/2014. Some Background information( i ):. Some Background information(ii):. S21= -0.5dB@11.7GHz. S11= -26dB@11.7GHz. Some Background information(iii):. Some Background information(iv):. Where:. AWA DRIVE BEAM---19MeV. Structure. When:.
E N D
Experiment of 11.7GHz PE at AWA DL 2/27/2014
Some Background information(ii): S21= -0.5dB@11.7GHz S11= -26dB@11.7GHz
Where: AWA DRIVE BEAM---19MeV
When: Proposed starting date of experiment: 5/1
Execution before the next meeting in around a week • 19MeV beam simulation---John/Dan • Structure assembling---Jing • Cleaning the rf load --- Sergey • Installation layout--- Scott (cross, pumping, ict location…) • Pump and leak check of diagnostic beamline--- Eric