1 / 10

Experiment of 11.7GHz PE at AWA DL

Experiment of 11.7GHz PE at AWA DL. 3/3/2014. Execution before the next meeting in around a week 19MeV beam simulation---John/Dan Structure assembling---Jing Cleaning the rf load --- Sergey Installation layout--- Scott (cross, pumping, ict location…)

sona
Download Presentation

Experiment of 11.7GHz PE at AWA DL

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Experiment of 11.7GHz PE at AWA DL 3/3/2014

  2. Execution before the next meeting in around a week • 19MeV beam simulation---John/Dan • Structure assembling---Jing • Cleaning the rf load --- Sergey • Installation layout--- Scott (cross, pumping, ict location…) • Pump and leak check of diagnostic beamline--- Eric Slide in Meeting on 2/27/2014

  3. When: Proposed starting date of experiment: 5/1

  4. The goal of this meeting is to decide the installation configuration so that we can start ordering the necessary parts.

  5. 11.7GHz Proposed Config. 02-28-2014

  6. 11.7GHz Proposed Config. 02-28-2014

  7. 11.7GHz Proposed Config. 02-28-2014

  8. 11.7GHz Proposed Config. 02-28-2014

  9. 11.7GHz Proposed Config. 02-28-2014

  10. Execution before the next meeting • Final configuration drawing based on the 3 points mentioned in the meeting and Order all needed vacuum parts. • Waveguide plumbing: loads (test L1&L2 with K1/K2 asap). • Laser beam flap and re-alignment • Finish beam simulation

More Related