100 likes | 250 Views
Experiment of 11.7GHz PE at AWA DL. 3/3/2014. Execution before the next meeting in around a week 19MeV beam simulation---John/Dan Structure assembling---Jing Cleaning the rf load --- Sergey Installation layout--- Scott (cross, pumping, ict location…)
E N D
Experiment of 11.7GHz PE at AWA DL 3/3/2014
Execution before the next meeting in around a week • 19MeV beam simulation---John/Dan • Structure assembling---Jing • Cleaning the rf load --- Sergey • Installation layout--- Scott (cross, pumping, ict location…) • Pump and leak check of diagnostic beamline--- Eric Slide in Meeting on 2/27/2014
When: Proposed starting date of experiment: 5/1
The goal of this meeting is to decide the installation configuration so that we can start ordering the necessary parts.
Execution before the next meeting • Final configuration drawing based on the 3 points mentioned in the meeting and Order all needed vacuum parts. • Waveguide plumbing: loads (test L1&L2 with K1/K2 asap). • Laser beam flap and re-alignment • Finish beam simulation