180 likes | 357 Views
RAKOR TW IV TAHUN 2013. PENINGKATAN PENGENDALIAN PROSES BISNIS UNTUK MENCAPAI WORLD CLASS SERVICES. PT PLN (Persero) SUMATERA BAGIAN SELATAN SEKTOR PEMBANGKITAN TARAHAN. BANDAR LAMPUNG 8 – 10 NOVEMBER 2013. PT. PLN (PERSERO) PEMBANGKITAN SUMATERA BAGIAN SELATAN SEKTOR PEMBANGKITAN TARAHAN.
E N D
RAKOR TW IV TAHUN 2013 PENINGKATAN PENGENDALIAN PROSES BISNIS UNTUK MENCAPAI WORLD CLASS SERVICES PT PLN (Persero) SUMATERA BAGIAN SELATAN SEKTOR PEMBANGKITAN TARAHAN BANDAR LAMPUNG 8 – 10 NOVEMBER 2013
PT. PLN (PERSERO) PEMBANGKITAN SUMATERA BAGIAN SELATAN SEKTOR PEMBANGKITAN TARAHAN Managing to O&M Growth Top 25% World Managing to O&M Growth Top 40% World ROAD MAP Managing to O&M Growth Top 50% World Transformation to O&M Growth World Class Standard Transformation to O&M Growth Best in Indonesia Transformation to O&M Growth Best in Indonesia TAHUN 2013 2014 2015 2016 2017 2018 EAF 82,33 80,68 84,47 85,72 86,71 89,18 EFOR 7,49 6,28 6,00 4,85 3,73 2,54 KAPASITAS YANG DIKELOLA (MW) 400 400 620 620 620 620 KEY STRATEGIC ACTION • IAM & OPI • Plant Health Recovery • Upgrade Capacity • IAM & OPI • Plant Performance Improvement • Plant Health Recovery • IAM & OPI • Plant Performance Improvement • Plant Health Improvement • Upgrade Capacity • IAM & OPI • Plant Performance Improvement • Plant Health Improvement • IAM & OPI • Plant Improvement Monitoring • Plant Health Monitoring • IAM & OPI • Plant Improvement Monitoring • Plant Health Monitoring ISO 9001 : 2008 ISO 14001 : 2004 ISO 28000 : 2007 ISO 31000 : 2009PERMENAKER 05 : 1996 PERKAP 24 : 2007
Permohonan Izin Landfill Fly Ash ditolak • oleh KLH : • Surat No. B-13222/Dep.IV/LH/PDAL/11/2013 • CEMS sudah diinstal dan beroperasi sejak • Akhir November 2013, PROGRAM PROPER • Social mapping • Training dan pembinaan kelompok menjahit • masyarakat dusun Pasir Putih • Rencana pengembangan industri makanan • untuk oleh – oleh khas Lampung • Rencana limbah domestik dipisahkan dan • diolah menjadi pupuk organik • PT PLN (Persero) SUMATERA BAGIAN SELATAN • SEKTOR PEMBANGKITAN TARAHAN
METAL CLADING • PT PLN (Persero) SUMATERA BAGIAN SELATAN • SEKTOR PEMBANGKITAN TARAHAN
ROOF Thermal Spray (Material 5-500) luasan 389 m2 UNIT 3(19 kejadian) Anti Abrasive Beam Agustus 2011 Ceramic (Material 6-041) Luasan 1183 m2 26 Jan 2010(Bottom Furn) 11 Apr 2010(Bottom Furn) 08 Jun 2010(Bottom Furn) 18 Jun 2010(Bottom Furn) 02 Jul 2010(Bottom Furn) 12 Agt 2010(Bottom Furn) 04 Sep 2010(Bottom Furn) 30 Nov 2010 (Evap. 24m) 13 Des 2010(Wall 14m) 28 Des 2010(Wall 14m) 03 Feb 2011 (Wall corner 14m) 28 Feb 2011 (Wall 13-14 m) 01 Apr 2011 (Wall rear 37m) 23 Mei 2011 (Roof no 9,10) 42 PANEL SUPERHEATER PANEL EVAPORATOR 38 • 03 Aprl 2009 • 11 Juli 2009 • 06 Sep 2009 11 Okt 2011 (Gagal Overlay, West Tube 9m) 8 Mar 2012 (Evap No.1) 3 Apr 2012 (Evap No.1) 20 Jun 2012 (Evap No.1) 2 Nov 2012 ( Evap No.1) 17 Juni 2013 (Evapo No.2) 34 30 • 29 Mei 2009 • 09 oct 2009 24 20 14 EAST FRONT REAR WEST
ROOF Thermal Spray (Material 5-500) luasan 389 m2 UNIT 4( 32 kejadian) Anti Abrasive Beam Maret 2012 Ceramic (Material 6-041) Luasan 1183 m2 42 PANEL SUPERHEATER PANEL EVAPORATOR 38 Inlet Cylone 1 kali Roof 5 kali 34 30 Water wall 6 kali Bottom Furnace 8 kali Corner 1 kali 24 20 Superheater 1 kali Evaporator 1 kali 14 Front 2 kali kali Evaporator 6 kali EAST FRONT REAR WEST
Coating Failure Aplikasi Coating
RENCANA PENGEMBANGAN REST AREA Taman Bermain Anak Area Parkir, minimarket dan Toilet
Parreto Loss Output PLTU SebalangJanuari s/d Oktober 2013 • PT PLN (Persero) SUMATERA BAGIAN SELATAN • SEKTOR PEMBANGKITAN TARAHAN
ASSESSMENT ASSET WELLNESS PLTU SEBALANG Mengukur Basis Performance Unit Membuat Rekomendasi Perbaikan/Improvement untuk peningkatan reliability dan availibility pembangkit Mengukur Kemampuan Unit Pembangkit dalam Pemenuhan Kriteria Lingkungan Hidup • PT PLN (Persero) SUMATERA BAGIAN SELATAN • SEKTOR PEMBANGKITAN TARAHAN
PROGRESS OPI Mindset, Capability and Leadership 7 Inisiatif : 3 Closed Technical System 8 Inisiatif : 7 Closed Manajemen Infrastructure 7 Inisiatif : 3 Closed OPI Wave 2 22 Inisiatif 12 Inisiatif CLOSED CLOSED
PROGRESS ALIH DAYA PERMENAKER : 01 Nopember 2012, Program Alih Daya harus sudah terlaksana Pengelompokan Alih Daya di Sektor Tarahan Berdasarkan Fungsi dan Area Kerja ada 9 grup alih daya • PT PLN (Persero) SUMATERA BAGIAN SELATAN • SEKTOR PEMBANGKITAN TARAHAN
UPGRADE SISTEM KONTROL (HARDWARE) • Program Bersarkan Rekomendasi Assessment ABB : • Penggantian Power Supply • Penggantian Modul Processor dan I/O DCS • Merubah Jalur Komunikasi • Penggantian PC dan Upgrading Software • Gangguan DCS Blink & Error Thermocouple : • RCFA No. 03/RCFA/ENG/2013 • RCFA No. 08/RCFA/ENG/2013 • RCFA No. 16/RCFA/ENG/2013 • RCFA No. 27/RCFA/ENG/2013 • PT PLN (Persero) SUMATERA BAGIAN SELATAN • SEKTOR PEMBANGKITAN TARAHAN
TERIMA KASIH • “SemangatKerja Kita AdalahEnergiUntukMelistriki Nusantara”