An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Centre for Energy Technology Ricoh Clean Energy Scholarship Fibre optic broadband: a pathway for remote geothermal energy to market? Ashok A Kaniyal* Prof. Graham ‘Gus’ J Nathan Prof. Jonathan J Pincus 34th IAEE International ConferenceStockholm, Sweden – 19-23 Jun 2011 School of Mechanical Engineering

  2. Geothermal Resource Exploitation in Australia Electricity transmission network • Engineered geothermal systems (EGS): recoverable resource is vast > 1.9 x 1025 J; • Considerable barriers: • Cooper Basin resources are >500 km from electricity grid, • Uncertainty in subterranean dynamics of heat flow, • Above ground plant performance uncertainty; • Not one unit of fully operational electricity generating capacity. Highest temperature geothermal resources near the Cooper Basin

  3. Why fibre optic network? • Interconnection to a market for low capital outlay; • Can attract data centres to bring forth a revenue stream for geothermal proprietors where… • Data centre energy demands can be met by geothermal energy of: • Low temperature (~120oC): Direct Use (DU) for absorption refrigeration • High temperature (~240oC): Combined Heat and Power (CHP). Natural gas could supplement electricity demand in both cases. • Potential economic viability of geothermal systems  from receiving retail electricity prices  opportunities for incremental capacity expansion.

  4. The Concept • Geothermal data fibre linkto National Broadband Network @ US$60m (DBCDE, 2010). NBN Co Fibre optic links Geothermal-data fibre link Fibre optic node Geothermal-data fibre link~US$60m DBCDE, 2010.

  5. Aims • Define the energy consumption profile of a data centre unit. • Develop assessment scenarios based on the most significant uncertainties affecting geothermal energy extraction. • Describe the geothermal system designs that could meet the data centres’ energy demands: • Low temperature direct use (120 deg. C) • High temperature CHP (240 deg. C) • Assess the economic viability of investments in energy and fibre optic common use resources.

  6. Cooling load~189 kWr NBN market Data Centre Co. hv Geothermal-data fibre link (1000-1500 km) IT electrical load~252 kWe Data centre energy requirements • Energy consumption characteristics of a modular 350 kWe data centre unit (Barroso, 2007): • Refrigeration load ~ 189 kWr • Electrical load ~ 252 kWe

  7. Systems and scenarios • Main uncertainty with respect to flow • Geo-fluid flow rate systematically varied: • Three scenarios examined • Explorers aim to generate higher flow rates than assumed: • Petratherm P/L: 70 kg/s and Geodynamics P/L: 100 kg/s

  8. Total IT electrical demand6.65/4.90/3.15 (H/M/L) MWe Geo-fluid flow rate High (H)/Med (M)/Low (L) outcomes Low temperature direct use Data centre serviced 14/19/9 units NBN market hv Geothermal-data fibre link (1500 km) mhw_geo(kg/s) Natural gas (NG) co-genH: 6.10 MWth/6.65 MWe M: 4.90 MWth/5.10 MWe L: 3.05 MWth/3.15 MWe Li-Br absorption/ electric chiller mhw_NG(kg/s) Direct use system • Three flow outcomes enable: • High  70 kg/s  19 data centres serviced per production well • Medium  50 kg/s  14 data centres serviced per production well • Low  30 kg/s  9 data centres serviced per production well

  9. Geo-fluid flow rateHigh (H)/Med (M)/Low (L) outcomes Total IT electrical demand6.65/4.90/3.15 (H/M/L) MWe High temperature CHP: 1.50/1.09/0.65 MWe NBN market Data centre serviced 19/14/9 units hv NBN augmentation(~1500 km) mhw_geo(kg/s) Natural gas (NG) cogenH:5.15 MWe / 4.85 MWth M:3.80 MWe / 3.65 MWth L:2.66 MWe / 2.45 MWth mhw_NG(kg/s) Li-Br absorption/ electric chiller Combined heat and power system • Three flow outcomes enable: • High  70 kg/s  19 data centres serviced per production well • Medium  50 kg/s  14 data centres serviced per production well • Low  30 kg/s  9 data centres serviced per production well

  10. Additional assumptions • Total of four production well increments examined: • Total of six wells - production and injection. • Data centre units assumed to be attracted to install facilities at a rate of 6 per year • Rate increases by one data centre unit every two years.

  11. Energy systems – Total costs

  12. Results of assessment of Economic viability

  13. Direct use system – IRR (%) Cost of capital

  14. CHP system – IRR (%) Cost of capital

  15. Fibre optic network augmentation: economic modelling assumptions

  16. Fibre optic augmentation: economic viability • IRR of 6% achieved when at least: • Medium flow outcome – 14 data centres serviced per production well • NPV < 0: Low flow outcome < 9 data centres serviced per production well

  17. Attracting data centres • Advantages of remote geothermal location for a data centre: • Obvious CO2 emissions mitigation benefit. • Lower cost of energy than a competing urban site. • Cost of land is negligible in comparison to an urban site. • Disadvantages of remote location: • Remoteness!! BUT almost all data centres are operated remotely. • Energy is only one of the factors effecting locational decision making • This research addresses two critical issues associated with attracting modular data centres but... • Investors’ heterogeneous preferences – public subsidy difficult to quantify.

  18. Conclusions • Economic viability of servicing a data centre with geothermal energy shown for: • Low temperature direct use system if geo-fluid flow > 30 kg/s • High temperature CHP system only if geo-fluid flow > 50 kg/s • Fibre optic link only viable if > 50 kg/s @ IRR = 6%. • Synergies that enable – high capital productivity, renewable resource to displace a high value product and at low scale. • Significant value in this approach: • Opportunity for incremental investment – extremely important for • resource characterisation and • incremental reductions in drilling expenditure. • Cash flow to enable geothermal industry to pave its own way

  19. THANK YOU! For your attention

  20. Comparison of capital costs Source: Gawlik and Kutscher - NREL (2000)