Shepard Energy Centre

Shepard Energy Centre. Environmental Stewardship. Overview. Nominal 800 MW Natural Gas Combined Cycle Early 2011 Received Regulatory Approval (Alberta Utilities Commission and Alberta Environment and Sustainable Resource Development) Cost: Approximately 1.35 Billion

mrinal
Download Presentation

Shepard Energy Centre

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Shepard Energy Centre

  2. Environmental Stewardship

  3. Overview • Nominal 800 MW Natural Gas Combined Cycle • Early 2011 Received Regulatory Approval (Alberta Utilities Commission and Alberta Environment and Sustainable Resource Development) • Cost: Approximately 1.35 Billion • Joint Venture with Capital Power • Currently under construction • COD: Early 2015

  4. Technology • Video • Natural Gas Combined Cycle • 2 on 1 Mitsubishi 501G gas turbine

  5. Environmental Attributes - Low Air Emissions • GHG – Less that 0.4 tonnes/MWh (less than half of the emissions from Coal) • SOx – Virtually none • NOx – Shepard will only emit between 3 ppm and 6 ppm • PM – virtually none • Mercury – No mercury emissions • We did extensive air dispersion modeling and Shepard has minimal impact on air quality in the region.

  6. Environmental Attributes - Water Consumption

  7. Shepard Site Photos – April 2013 Aerial View Looking South

  8. Shepard Site Photos – April 2013 Fiberglass Cooling Tower Showing End Wall And Louver Installation

  9. Shepard Site Photos – April 2013 HRSG #2 Finger Rack Area

  10. Shepard Site Photos – April 2013 Combustion Turbine #1

  11. Shepard Site Photos – April 2013 Low Pressure Steam Turbine Rotor Insertion