An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Mu2e Working Group Meeting June16, 2010 1:00– 2:30 PM Snake Pit

  2. Agenda • Project Update (including requirements documents development, CDR development and resource/staffing needs [Ron Ray] • Cosmic Ray Veto [Craig Dukes] • Schedule Development and Change in Project Controls [Dean Hoffer] • Project Timeline [Dean and All] • Next Meeting • Action Items 16-Jun-2010 Mu2e WGM

  3. Project Controls and Schedule Development • Change in Project Controls Support • Larry Kirkpatrick – Lead • Dave Leeb • Bob Aprile (limited) • Evaluating current status of existing schedule and analyzing WBS • Discussion with Ron on analysis results • Project Controls meet with L2s 16-Jun-2010 Mu2e WGM

  4. 16-Jun-2010 Mu2e WGM

  5. Next Meeting • Next Meeting 13-Jul, 1:00 – 2:30 PM • Next L2 Presentation? 16-Jun-2010 Mu2e WGM

  6. Action Items a) Get L2 Manager for calorimeter in place. – Ron Ray b) Get resources required for CD-1 activities into P6. Begin adding relationships and developing BOEs – L2s/Project Controls c) Understand and document the magnitude of the heat shield problem – Rick Coleman d) Get moving on FE Electronics – Ron Ray 16-Jun-2010 Mu2e WGM