Mu2e Working Group Meeting

Mu2e Working Group Meeting. June 15, 2011 1:00– 2:00 PM Black Hole. Agenda. Project Update [Ron Ray] General Technical Progress Technical and Resource Issues Actions from Director’s Conceptual Design Review WBS 1.2 Accelerator Progress Report [Steve Werkema]

miyo
Download Presentation

Mu2e Working Group Meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Mu2e Working Group Meeting June 15, 2011 1:00– 2:00 PM Black Hole

  2. Agenda • Project Update [Ron Ray] • General Technical Progress • Technical and Resource Issues • Actions from Director’s Conceptual Design Review • WBS 1.2 Accelerator Progress Report [Steve Werkema] • Planning for Director’s Cost, Schedule and Management Review [Dean Hoffer] • Next Meeting [Dean Hoffer] 15-Jun-2011 Mu2e WGM

  3. Director’s Cost, Schedule, and Management Review • Drafting Charge will address cost, schedule, management (including ES&H), and follow-up on status of design review recommendations needed for CD-1. Behind on issuing draft but will have out by end of month. • Project to establish target date for Director’s Review • Needs to be realistically aggressive • Base the date on when the project feels they can be ready for CD-1 When a DOE review might be scheduled is not the key driver. The driver is having a successful review. • The earlier the date can be established the better because of reserving rooms and availability of reviewers. 15-Jun-2011 Mu2e WGM

  4. Next Meeting • Next scheduled 20-July from 1:00 to 2:30 in the Snake Pit • L2 Status Reports (Which two are next?) 15-Jun-2011 Mu2e WGM