Bericht aus dem DFN-NOC

Bericht aus dem DFN-NOC. 41. DFN Betriebstagung 12. – 13. Oktober 2004 Hubert Waibel waibel@noc.dfn.de. Agenda. Entwicklung GWiN Umbauarbeiten Organisatorisches Ausblick. Entwicklung GWiN Topologie/Ausbaustufe 4. B. HH. H. K. E. L. F. STM-16, 2.5 Gbit/s STM-64, 10.0 Gbit/s.

hamal
Download Presentation

Bericht aus dem DFN-NOC

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Bericht aus dem DFN-NOC 41. DFN Betriebstagung 12. – 13. Oktober 2004 Hubert Waibel waibel@noc.dfn.de 41. DFN Betriebstagung

  2. Agenda • Entwicklung GWiN • Umbauarbeiten • Organisatorisches • Ausblick 41. DFN Betriebstagung

  3. Entwicklung GWiN Topologie/Ausbaustufe 4 B HH H K E L F STM-16, 2.5 Gbit/s STM-64, 10.0 Gbit/s ER S KA M 11. März 2003 41. DFN Betriebstagung

  4. Entwicklung GWiN Topologie/Ausbaustufe 4 B HH H K E L F STM-16, 2.5 Gbit/s STM-64, 10.0 Gbit/s ER S KA M 30.03: K-M raus 31.03: F-M rein 41. DFN Betriebstagung

  5. Entwicklung GWiN Topologie/Ausbaustufe 4 HH B H K E L F STM-16, 2.5 Gbit/s STM-64, 10.0 Gbit/s ER KA S M 30.03: K-M raus 31.03: F-M rein 11.05: E-M raus 12.05: ER-E rein 27.05: B-M rein 41. DFN Betriebstagung

  6. Entwicklung GWiN Topologie/Ausbaustufe 4 H B HH K E L F STM-16, 2.5 Gbit/s STM-64, 10.0 Gbit/s ER S KA M 30.03: K-M raus 31.03: F-M rein 11.05: E-M raus 12.05: ER-E rein 27.05: B-M rein 01.06: B-HH rein F-S rein E-L rein 02.06: L-M raus F-S raus 41. DFN Betriebstagung

  7. Entwicklung GWiN Topologie/Ausbaustufe 4 HH H B K E L F STM-16, 2.5 Gbit/s STM-64, 10.0 Gbit/s ER S KA M 30.03: K-M raus 31.03: F-M rein 11.05: E-M raus 12.05: ER-E rein 08.06: B-L rein B-ER raus H-L raus E-F raus 27.05: B-M rein 01.06: B-HH rein F-S rein E-L rein 02.06: L-M raus F-S raus 03.06: S-M rein 07.06: B-HH raus 41. DFN Betriebstagung

  8. Entwicklung GWiN Topologie/Ausbaustufe 4 H B HH 08.06: B-L rein B-ER raus H-L raus E-F raus K E L F 09.06: ER-L rein E-H rein F-HH raus HH-L raus ER-S raus STM-16, 2.5 Gbit/s STM-64, 10.0 Gbit/s ER KA S 29.07: B-F rein M 30.03: K-M raus 31.03: F-M rein 11.05: E-M raus 12.05: ER-E rein 27.05: B-M rein 01.06: B-HH rein F-S rein E-L rein 02.06: L-M raus F-S raus 03.06: S-M rein 07.06: B-HH raus 41. DFN Betriebstagung

  9. Entwicklung GWiN Topologie/Ausbaustufe 4 B HH H 08.06: B-L rein B-ER raus H-L raus E-F raus K E L F 09.06: ER-L rein E-H rein F-HH raus HH-L raus ER-S raus STM-16, 2.5 Gbit/s STM-64, 10.0 Gbit/s ER KA S 29.07: B-F rein Kie Hei M 30.03: K-M raus 31.03: F-M rein 11.05: E-M raus 12.05: ER-E rein 27.05: B-M rein 01.06: B-HH rein F-S rein E-L rein 02.06: L-M raus F-S raus 03.06: S-M rein 07.06: B-HH raus F-B raus 41. DFN Betriebstagung

  10. GWiN Topologie/Peerings B HH H K E L F ER KA S M 2.5 Gbit/s Telia 155 Mbit/s T-Online 622 Mbit/s UUnet Cable & Wireless 1 Gbit/s DE-CIX 1 Gbit/s 622 Mbit/s T-Online 1 Gbit/s 2.5 Gbit/s Global Crossing 10 Gbit/s 155 Mbit/s Géant 1 Gbit/s UUnet, ... 155 Mbit/s Cable & Wireless 622 Mbit/s Abovenet 622 Mbit/s T-Online T-Online 41. DFN Betriebstagung

  11. GWiN Topologie/Paradigmenwechsel IR CR AR CR Anwender X.21 E1, E3 STM-N ... Anwender Peering Upstream 1/10 GigE Peering Anwender Peering ... Peering 41. DFN Betriebstagung

  12. Hard- und Softwareumbauarbeiten • Ende April/Anfang Mai  alle c12XXX auf 12.0(26)S2 • Einbau der ersten 4port GigE LCs • Schwerer IOS Bug im Zusammenhang mit den 4 port GigEthernet LCs • Einbaustop 4port GigE LCs und zum Teil sogar Rückbau auf alte 3port GigE LCs • Ende Juli/Anfang August  alle c12XXX auf 12.0(26)S3 • August/September  Einbau der 4port GigE LCs und sonstige Hardwarearbeiten • Mitte September  mittelschwerer Bug mit SNMP Zählern auf GigE Subinterfaces • Mitte/Ende September  erneuter reboot von „vielen“ c12XXX nötig 41. DFN Betriebstagung

  13. Kontakt DFN-NOC • E-Mail: noc@noc.dfn.de • Hotline: + 49 (0)711 / 633 14 – 112 Montag – Freitag: 08:30 Uhr bis 18:00 Uhr (genauer: an den Arbeitstagen des Landes BaWü) • Internet: http://www.noc.dfn.de  Trouble Tickets  Wartungsmeldungen  Hinweise zur Konfiguration (Router, Interface, …) 41. DFN Betriebstagung

  14. Mitarbeiter DFN-NOC  Dipl.-Inf. Bettina Kauth (Elternzeit)  Dipl.-Volksw. Peter Heiligers (Elternteilzeit – 2d/w)  Dipl.-Chem. Irmhild Lemke  Dipl.-Phys. Thomas Schmid  Dr. sc. nat. Thilo Scholpp  Dipl.-Ing. Robert Stoy Dipl.-Inf. Hubert Waibel im Schnitt sind ca. 4.5 Mitarbeiter im Office 41. DFN Betriebstagung

  15. Arbeitsorganisation Mittwoch t 04:30 18:00 08:30 Dienstag t 08:30 18:00 04:30 41. DFN Betriebstagung

  16. Ausblick • Übernahme u. Weiterführung 6WiN/IPv6 zum Ende des Jahres • Einführung Fehlermanagement • XWiN • GWiN Tuning (Qos, OSPF, BGP convergence ...) 41. DFN Betriebstagung

  17. 41. DFN Betriebstagung