1 / 33

Project Team

Project Team. Potomac Valley Brick. Matrix Design-Build. General Contractor. Matrix Settles. Architect. TM/R Engineering. MEP Engineers. GJB Engineering, Inc. Civil Engineer. Adtek Engineers. Structural Engineer. Site. Site. Approximate Conservation Easement. Current Building.

Download Presentation

Project Team

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Project Team Potomac Valley Brick Matrix Design-Build General Contractor Matrix Settles Architect TM/R Engineering MEP Engineers GJB Engineering, Inc. Civil Engineer Adtek Engineers Structural Engineer

  2. Site

  3. Site Approximate Conservation Easement

  4. Current Building

  5. Current Floor Plan

  6. Concept Sketches

  7. 1st Floor Plan

  8. Elevation

  9. Interior

  10. Current Floor Plan

  11. Current Floor Plan

  12. 1st Floor Plan

  13. 1st Floor Plan

  14. 1st Floor Plan

  15. 1st Floor Finish Plan

  16. 2nd Floor Plan

  17. 2nd Floor Plan

  18. 2nd Floor Plan

  19. 2nd Finish Floor Plan

  20. Roof Plan

  21. 2nd Floor Ceiling Plan

  22. 1st Floor Ceiling Plan

  23. 1st Floor Ceiling Plan

  24. 1st Floor Ceiling Plan

  25. Building Section

  26. Building Section

  27. Interior

  28. Interior Design Features • Innovative rotational displays. • Mobile vertical displays for maximum flexibility. • Harmonious blend of exterior and interior symmetries. • High, light colored ceiling creates open space. • Extensive use of PVB products within design. • Central circular stair is focal point of space.

  29. Sustainable Features • Reuse of materials where possible. • Use of sustainable materials. • Use of materials with high recycled content. • Distribution of natural light. • Low flow plumbing fixtures. • Solar powered, sensor activated faucets • Energy efficient lighting fixtures • Daylight sensing photoelectric lighting control • Occupancy sensing lighting control • ASHRAE 90.1 Compliant Mechanical Design

  30. Tentative Time Line

  31. Rules & Regulations • Mandatory safety gear at all times while on site. • Hard hats, safety glasses and closed, hard sole shoes. • Be careful at all times. • Be aware of your surroundings. • Obey all posted rules.

More Related