An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WP, Inc. • Brought to you byCandace Hunt, Drew Siebert, Laura Anstine • MGMT 580-Quality Management & Statistical Analysis • October 25, 2012 • Connie Fleming • Southwestern College Professional Studies Automatic Parts Washer

  2. Problem Statement • Frequent shutdowns of the automatic parts washer causes production slowdowns due to the forced re-cleaning of parts and maintenance and/or cleaning to the automatic parts washer.

  3. Problem Statement Continued • Because this machine is part of the process of every part produced, customers, management, maintenance, and operators are all effected by the problem in the form of increased workload, missed production goals, and missed deadlines.

  4. Problem Solving Team • Operator • Automation Engineer • Maintenance Technician • Scheduling Manager • Production Manager

  5. Mission Statement • As a problem-solving team, we will concentrate on the causes of the clogging. We will investigate in-house processes as well as possible supplier material inadequacies.

  6. Problem Solving Tools • Cause-And-Effect Diagram • Generic Brainstorming Exercise • Force-Field Analysis • Corrective Action Plan

  7. Problem Solving Steps • Step 1. Plan: Recognize a Problem Exists • Step 2. Plan: Form an Improvement Team • Step 3. Plan: Develop Performance Measures • Step 4. Plan: Clearly Define the Problem • Step 5. Plan: Document and Analyze the Problem/Process • Step 6. Plan: Determine Possible Causes • Step 7. Do: Identify, Select, and Implement the Solution • Step 8. Study: Evaluate the Solution • Step 9. Act: Ensure Permanence

  8. Problem Analysis • Frequent shutdowns of the automatic parts washer due to small particles clogging spray nozzles causes production slowdowns due to the forced re-cleaning of parts and maintenance/cleaning to the automatic parts washer. Because this machine is part of the process of every part produced, customers, management, maintenance, and operators are all effected by the problem in the form of increased workload, missed production goals, and missed deadlines.

  9. Automatic Parts Washer Cycle

  10. Performance Measures

  11. Developed Plan • Frequency of Clogging increased as day progressed and machine was in service • Inspections were performed and white, flaky particles were discovered as the source of the problem • Uncertainty of what the white and flaky particles are from?

  12. Cause-Effect Diagram Material Equipment Soap Buildup Debris from Washer Hard Water Buildup Water Temperature Capability Part Material Airborne Chemicals Water Pressure Airborne Dust Clogged Nozzles Environment Other Machine Debris Water Temperature Maintenance Machine Misuse/Abuse Add soapy water after evaporation Improper Soap Usage Methods People

  13. Brainstorming Results • Soap scum buildup • Debris from washer component • Filter • Pump • Hoses/Piping • Foreign material entering washer • Protective operator clothing • Debris from other machines • Airborne dust or chemicals • Flakes from container lining • Flakes from part-holder • Cleaned debris from parts • Material from employees washing personal items in the machine • Soap buildup • Hard water minerals • Inadequate water pressure • Improper soap usage

  14. Force-Field Analysis • Driving Forces • Free up maintenance time to work on other machines • Increase overall throughput • Increase quality of products produced • Restraining Forces • Time available for investigation • Operator resistance to change • No filter for protection of clogging • Limited soap supply • Need for a specialized filter • Lack of money to replace all affected parts on the machine

  15. Corrective Action Plan • Regulate water temperature with thermostat controlled automatic modulated heater • Thorough cleaning of tank at each end of day • Add water & soap at beginning of each day and only add water as make-up throughout the day • Add filter to prevent soap particles from clogging nozzles • Re-evaluate success after thirty days • Number of times the nozzles clogged • How the regulated water temperature contributed to maintaining a clean parts washer • How a consistent cleaning schedule contributed to maintaining a clean parts washer • The number of parts that needed to be rewashed

  16. Summary • Frequent shutdowns of automatic parts washer due to small particles clogging spray nozzles cause production slowdowns due to the forced re-cleaning of parts and maintenance/cleaning to the automatic parts washer. • Problem could be caused by soap scum buildup, debris from washer component and foreign material entering washer such as debris from other machines, airborne dust or chemicals, soap buildup and hard water minerals. • Driving forces to make changes and improvements to the parts washer include freeing up maintenance time to work on other machines, increase the overall throughput of parts, and increase the quality of products produced by WP, Inc. • Possible corrective action plans to help improve the parts washer include regulating the water temperature with a thermostat controlled by an automatic modulated heater, thorough cleaning of the tank at the end of each day, adding a filter to prevent the nozzles from clogging and only adding water and soap at the beginning of each day. • After thirty days the progress will be evaluated by examining the number of times the nozzles clogged, how regulated water temperature and a consistent cleaning schedule contributed to maintaining a clean parts washer, and examining the number of parts that needed to be rewashed.